Rolling stock
How trains workEvery class by numberTrain of the day Every train is drawn to one scale from its recorded dimensions; “indicative” marks estimates.
In service 122 line-up of 119 drawn
Every train in the list.
No trains in service match.
Schematic side elevations from each train's recorded dimensions, standing on the same rail. Choose 1× to see them at the stated 10 px per metre, or 2× or 4× to look closer, and scroll or drag sideways; Full screen shows the line-up alone. Drawings labelled indicative are estimates, from photographs and published figures, where no dimensioned drawing has been published. Lengths are over couplers where published; “about” marks one added up from the cars and the couplers between them, as drawn. People are seats plus standing at five per square metre, where both are published; otherwise seats are shown where published, so sorting by capacity puts a seats-only figure among the people figures, and trains with neither come last. Coupled sets are two or three units of one class coupled together, as they run in passenger service; where no length is published, theirs is the units added up, so it reads “about”. Compare any two or three trains →
Freight wagons and containers are not in this line-up: freight wagons and containers →
The poster
Eleven of the trains above at full length, drawn to one scale and set shortest to longest: as wallpaper for a screen, or at A1 to print, where the Eurostar joins them at 1:500. The posters are redrawn with the site, so they always carry the latest drawings, and each says when it was drawn.
- Wallpaper (PNG) 1920 × 1080 354 KB · 3840 × 2160 (4K) 789 KB · 2560 × 1600 (16:10) 496 KB
- Phone wallpaper (PNG) 1179 × 2556 (iPhone 15, 16) 432 KB · 1290 × 2796 (iPhone Plus, Pro Max) 481 KB · 1080 × 2400 (Android) 391 KB · 1440 × 3200 (Android QHD+) 546 KB
- To print (SVG) A1 landscape at 1:500, with the Eurostar 2.7 MB
- Scalable (SVG) 16:9 2.4 MB · 16:10 2.4 MB
Not drawn yet 3
No dimensioned drawing of these has been found yet. Each joins the line-up when it is drawn.
| Train | Lines or operators | Since |
|---|---|---|
| Channel Tunnel Shuttle wagons | LeShuttle | 1994 |
| Class 18 battery-hybrid shunter (Clayton CBD90 Hybrid+) | 2021 | |
| Class 99 (Stadler) | 2026 |
On order and planned 6
Siemens Mobility, Vienna and Goole
Alstom (Avelia Horizon)Drawing to comeClass 895 · with HS2's first services, May 2036 to October 2039
Hitachi Rail and Alstom (a joint venture): Derby, Crewe and Newton AycliffeDrawing to comeClass 897 Serenza · date not yet announced
CAF, Newport (Wales)
Siemens Mobility (option on the 2024 Stock contract)
Siemens Mobility (option on the 2024 Stock contract)
Timeline 192
Every train type from its introduction to its withdrawal, or to today if still running. Select a bar or a name to open its page.
On order, so not on the timeline yet, with when each is expected: Class 895, with HS2's first services, May 2036 to October 2039; Class 897 Serenza, date not yet announced; New Bakerloo line trains, early 2030s (TfL); some reports say about 2035; New Central and Waterloo & City trains, 2030s (aspiration).
Withdrawn 68
Drawn 43 of 68 0 more with sources found 25 waiting for a dimensioned source