Rolling stock › In serviceData updated
Class 801 Azuma
The all-electric version of Hitachi's Intercity Express Train, built for the East Coast Main Line.
Shown
Scale
427 ft (130.12 m) (the cars’ lengths added)
Class 801 Azuma · schematic drawing GB Trains · gbtrains.uk/stock/801/ · CC BY 4.0
You’re welcome to use this drawing
Free to use, change and share, in print or online, under CC BY 4.0. Please credit it:
Drawing: GB Trains, gbtrains.uk, CC BY 4.0Online, link the words to this page. The downloaded file already carries the credit; please leave it on. What the licence covers
Liveries
Special liveries 6
- 'Gresley 150' (launched 19 Jun 2026) Replaced 'Century' on 801228 18 Jun 2026.
- 801204 'Our Planet' 22 Sep 2024; bio-based vinyl.
- 801205 'She's electric' 27 Mar 2025 (Oasis).
- 801207 'Darlington' 14 Jan 2025 (S&DR 200).
- 801224 Bradford 2025 City of Culture 19 May 2025.
- 801226 'Together' Pride Eight LGBTQ+ flags across all nine cars, from 1 Jun 2023; LNER says it stays permanently.
Former liveries 1
LNER'Century' (801228)Ran as LNERFormer15 May 2023 to 18 Jun 2026Not drawn yet
Explore this train
Compare it
- Compare with the Class 800 and the Class 802, of the same family →
- Or one at a time: Class 800 (same family), Class 802 (same family)
Who runs it
- LNER 42 trains
Where it runs
- Find LNER on the Great Britain mapEvery operator’s routes, each through its stations; choose it under Operators.
Read on
- The Class 800 series family7 classes side by side
- How its power works
- All electric trains
Full specification
- Type
- Electric multiple unit
- Builder
- Hitachi Rail (assembled at Newton Aycliffe)
- Family
- Class 800 series, with Class 800, Class 802, Class 803, Class 805 Evero, Class 807 Evero, Class 810 Aurora
- Built
- 2017–2020
- In service
- since 2019
- Operators
- LNER
- Formation
- 5 cars (DPTS-MS-MS-MC-DPTF) or 9 cars (DPTS-MS-MS-TS-MS-TS-MC-MF-DPTF, as Hitachi designed them in 2014)
- Fleets
- LNER: 42
- Top speed
- 125 mph (201 km/h) in service; designed for 140 mph (225 km/h)
- Traction
- Electric 25 kV AC overhead · all electric trains →
- Power
- 25 kV AC overhead; one diesel generator unit, as on the Class 800, for emergency traction and auxiliary power · how it works
- Bogies
- Hitachi bolsterless bogies; inner-frame trailer bogies under the 9-car trains' two TS cars · drawn with the same bogie component as Class 800, Class 802, Class 803, Class 805 Evero, Class 807 Evero
- Train length
- 427 ft (130.12 m) (the cars’ lengths added)
- Coupled
- 2 × 5 cars, about 854 ft (260 m) (the units’ lengths added)
- Car height
- 12 ft 3 in (3.725 m), to the body's roof edge; the roof covers stand about 11 in (0.27 m) higher
- Profile
- main-line
- Seats per train
- As designed (Hitachi, 2014): 5 cars 315 (45 first class, 270 standard); 9 cars 627 (101 first class, 526 standard)
- Status
- In service since September 2019: the first five-car 801s from 16 September 2019, the nine-car ones that November. Owned by Agility Trains East and maintained by Hitachi. An Azuma first ran under ETCS Level 2 cab signalling between Welwyn Garden City and Hitchin overnight on 15-16 July 2026; LNER's services begin moving to ETCS from late 2026.
Car types
| Code | Car | Length | Doors per side |
|---|---|---|---|
| DPTS | Driving pantograph trailer, standard class | 85 ft 6 in26.06 m | 2 single |
| MS | Motor, standard class | 85 ft 4 in26.00 m | 2 single |
| MC | Motor, composite | 85 ft 4 in26.00 m | 2 single |
| DPTF | Driving pantograph trailer, first class, with kitchen | 85 ft 6 in26.06 m | 2 single |
Sources and checking 46
How we source figures → · Spotted a mistake? Tell us → (opens in a new tab)
Show the 46 sources from Wikimedia Commons, LNER, Walter Baxter, via Geograph and Wikimedia Commons and 16 more
- Side of 801 226 Driving Pantograph (Car 1) (photograph, 31 July 2026, CC BY-SA 4.0) Wikimedia Commons (Three76Five43Nine72), 31 July 2026the first-class driving car's three blanked window positions (layout only)
- Hitachi press release on the Intercity Express Programme (East Coast) Hitachi, 16 April 201412 five-car and 30 nine-car electric trains
- Class 800/801 trains for the Intercity Express Programme (Hitachi Review vol. 63 no. 10, archived) Hitachi, 2014design, lengths, speed; the 9-car formation and its inner-frame trailer bogies (Table 1, pp. 648-649); bolsterless bogies; one generator unit for emergency traction and auxiliary power (p. 650); design seats (Table 1, Fig. 2)
- East Coast Main Line Agility Trainsowner, availability-based contract
- Report 13/2020: incident at Neville Hill depot Rail Accident Investigation Branch, November 2020LNER's IETs (Class 800s first) in passenger service from 15 May 2019; 125 mph (201 km/h)
- ADPL-12-01-02 Rev 4: Class 800 LNER Azuma livery, sheets 1-3 Atlantic Design Projects for LNER (released under FOI: 'Class 800/801 Livery Designs'), 12 September 2018, pp. sheets 1-3side elevation of the driving and intermediate cars, livery colours (measured)
- LNER 100 Azuma livery, final design, version 2.0 (supply deck) LNER (released under FOI: 'Class 800 Azuma special liveries'), 2023, pp. pp. 2, 7, 8side elevations, bogies and skirts (measured)
- First Pantographs for New Class 800 Series IEP Trains Leave UK for Japan Hitachi Rail, 28 February 2014pantographs: Brecknell Willis twin-strip single-arm, two per train (one on each driving car, as drawn)
- Pantograph on a British Rail Class 800 'Azuma' of LNER seen from the main bridge at Leeds railway station (5th July 2019).jpg: a driving car's roof well from above, the pantograph folded (photograph, CC BY-SA 4.0) Mtaylor848, via Wikimedia Commons, 5 July 2019the drawing's pantographs: folded in the well, the head inboard, the pan and the arms' end 0.63 and 0.97 of the way along the well (photograph, layout only)
- Penzance - GWR 802013 (DPTS 831013).JPG: a driving pantograph trailer's roof from above, the pantograph folded (photograph, CC BY-SA 4.0) Geof Sheppard, via Wikimedia Commons, 27 November 2018the drawing's pantographs: the DPTS's well and its folded pantograph, the head inboard (photograph, layout only)
- 805 008 Mill Meece 180124.jpg: 805 008 at Mill Meece, its pantograph raised (photograph, CC BY 2.0) kitmasterbloke, via Wikimedia Commons, 18 January 2024the drawing's pantographs: raised, the arms coming up out of the lowered roof, the knee towards the cab (photograph, layout only)
- 805008 Mill Meece 180124.jpg: 805 008 at Mill Meece, near side on (photograph, CC BY 2.0) kitmasterbloke, via Wikimedia Commons, 18 January 2024the drawing's pantographs: the lowered roof's length and the folded pantograph's place along it, from the inner end (photograph, scaled by the car's doors and windows)
- GWR 802011 (835011 pantograph).JPG: the pantograph on an 802's first-class driving car (photograph, CC BY-SA 4.0) Geof Sheppard, via Wikimedia Commons, 28 January 2023the drawing's pantographs: one on the first-class driving car too (photograph, layout only)
- Interim report IR1/2026: collision between two passenger trains at Elstow, near Bedford Rail Accident Investigation Branch, October 2026, p. 7 (figure 3)the drawing's pantographs: the lowered roof's depth and the folded height over it (the Class 810's, measured; taken as the same AT300 roof)
- LNER 800205 (photograph, 3 June 2026, CC BY 4.0) Wikimedia Commons (dunsphotos), 3 June 2026the yellow nose front: its extent and colour (lit, sampled)
- 800 203 LNER Azuma York-KX at Offord Cluny foot crossing (photograph, 5 August 2026, CC BY 4.0) Wikimedia Commons (kitmasterbloke), 5 August 2026the yellow nose front (layout only)
- LNER Azuma at Grantham (photograph of 800111, 19 June 2019, CC BY-SA 2.0) Wikimedia Commons (Chris Morgan, via Geograph), 19 June 2019the yellow nose front (layout only)
- 801227, Welham Green, December 15th 2024.jpg (photograph, CC BY-SA 4.0) Southsea_Matt, via Wikimedia Commons, 15 December 2024the yellow nose front on an 801 (layout and colour)
- Bristol Temple Meads - GWR 802006+802020 (802014).JPG (photograph, CC BY-SA 4.0) Wikimedia Commons (Geof Sheppard), 9 March 2019the open noses of two coupled units, side on: the face, its height and the couplers and electrical heads between (re-measured; the AT300 front end, alike on the 800, 801, 802 and 805)
- Nose to nose - geograph.org.uk - 6966139.jpg (photograph, CC BY-SA 2.0) Wikimedia Commons, from Geograph (DS Pugh), 15 September 2021two coupled 801s side on: the open faces and the gap between them (re-measured)
- ADPL-12-01-02 Rev 4: Class 800 LNER Azuma livery, sheets 1-3 Atlantic Design Projects for LNER (released under FOI: 'Class 800/801 Livery Designs'), 12 September 2018, p. sheet 1 (side B)the cab front laid on the outline, with the cone's lower lip and the apron's facet (measured)
- ADPL-12-01-02 Rev 4: Class 800 LNER Azuma livery, sheets 1-3 Atlantic Design Projects for LNER (released under FOI: 'Class 800/801 Livery Designs'), 12 September 2018, pp. sheet 1 (side B), vectorsthe cab livery (red sweep, window surround and window, silver crescent, red lower nose), the headlamp and the cab door's grab rails (read off the sheet's vectors)
- An LNER Azuma train on the East Coast Main Line (geograph 7347905): 801226's leading driving car side on, long lens, level, the nose closed (photograph, CC BY-SA 2.0) Walter Baxter, via Geograph and Wikimedia Commons, 21 November 2022the driving cars' cab-end bogie position (the wheel centres read side on against the cab door and the first passenger door)
- Allerford - GWR 802111 (839111) at speed.JPG (photograph, CC BY-SA 4.0) Wikimedia Commons, 14 May 2022the bogies' wheelbase and the driving cars' inner bogie position (the axle-end covers read side on against the cab door and the passenger doors)
- Allerford - GWR 802111 (831111) at speed.JPG (photograph, CC BY-SA 4.0) Wikimedia Commons, 14 May 2022the driving cars' inner bogie position (the same unit's other end, which fixes the axle-end covers' depth behind the bodyside)
- GWR 802102 (831102) coupling detail.JPG and GWR 802006 (831006) coupling detail.JPG (photographs, CC BY-SA 4.0); Taunton - GWR 800003+800004 coupled.JPG (CC BY-SA 4.0) Wikimedia Commons (Geof Sheppard), 2017-2022the Dellner coupler behind the nose's doors, which open to couple (20 October 2026; layout only)
- Allerford - GWR 802111 (839111) at speed.JPG (photograph, CC BY-SA 4.0) Wikimedia Commons, 14 May 2022the driving car's underframe side on: skirt panels, latches, grilles, recess and heights
- Allerford - GWR 802111 (831111) at speed.JPG (photograph, CC BY-SA 4.0) Wikimedia Commons, 14 May 2022the standard driving car's grilles and notches
- An LNER Azuma train on the East Coast Main Line (geograph 7347905): 801226's leading driving car side on, long lens, level, the nose closed (photograph, CC BY-SA 2.0) Walter Baxter, via Geograph and Wikimedia Commons, 21 November 2022the 801's driving car's skirt panels and latches over its cab end
- Allerford - GWR 802111 (839111) at speed.JPG (photograph, CC BY-SA 4.0) Wikimedia Commons, 14 May 2022the inner gangway, side on: end frames, bellows, cables and their heights
- GWR 800020 (814020 and 815020) bogies.JPG (photograph, CC BY-SA 4.0) Wikimedia Commons, 31 July 2021the inner gangway close and level: the bellows' colour, folds and seam, the cables and brackets
- 807006 passes 350261 at Stafford 31 03 25 (photograph, CC BY-SA 2.0) Foulger Rail Photos, via Wikimedia Commons (Flickr 54424000277), 31 March 2025the 807's inner gangway, three-quarter: the same end frames, brackets and bellows
- An LNER Azuma train on the East Coast Main Line (geograph 7347905): 801226's leading driving car side on, long lens, level, the nose closed (photograph, CC BY-SA 2.0) Walter Baxter, via Geograph and Wikimedia Commons, 21 November 2022the door-leaf windows (measured on the leaf) and the display panel by the first window
- An LNER Azuma on the East Coast Main Line (geograph 8128257): 801204's driving car side on, long lens (photograph, CC BY-SA 2.0) Walter Baxter, via Geograph and Wikimedia Commons, 10 August 2025the door-leaf windows and both display panels, by the first window and ahead of door 2 (rectified on the doors)
- LNER Azuma passing Cupar with a KX-Aberdeen service.jpg (photograph, CC BY 4.0) Wikimedia Commons, 5 June 2026LNER's door leaves in the body colour (colour only)
- September 16 launch for Class 801 Azumas on London-Leeds route Rail, 1 August 2019the first 801/1s into passenger service on 16 September 2019, a pair on King's Cross-Leeds (announced 1 August 2019)
- LNER completes first live ETCS Level 2 Azuma digital signalling trial Global Railway Review, 21 July 2026the first live ETCS Level 2 running, Welwyn Garden City-Hitchin, 15-16 July 2026; migration from late 2026
- Taunton - GWR 800003+800004 coupled.JPG (photograph, CC BY-SA 4.0) Wikimedia Commons (Geof Sheppard), 31 July 2017the open space under the couplers between two coupled units' noses
- LNER unveils 'Century' Azuma train Business Traveller, 16 May 2023the livery and its unit, 801228, unveiled May 2023
- British Rail Class 801 Wikipedia, read 13 October 2026the livery, its unit and its dates
- A moving legacy lner unveils gresley 150 azuma livery to celebrate life of railway pioneer LNER, read 13 October 2026the livery, its unit and its dates
- LNER introduces 'Our Planet': the named train championing sustainable travel LNER (press release), 22 September 2024the livery, its unit and its date (22 September 2024)
- LNER unveils 'Darlington' livery as it celebrates 200 years of the railway LNER (press release), 14 January 2025the livery, its unit and its date (14 January 2025)
- LNER Azuma unit given unique livery to celebrate Railway 200 Rail, 15 January 2025the nine-car 801207 in the Darlington livery
- Together for a Summer of Pride: LNER launches Azuma train celebrating Pride LNER (press release), 1 June 2023the livery, its eight flags on all nine cars, its date and that it stays
- A Guide to Overhead Electrification (132787-ALB-GUN-EOH-000001, rev 10) Network Rail (prepared by Alan Baxter), February 2015, p. 39the contact wire in the In operation drawing: 15 ft 5 in (4.7 m) above rail, Network Rail's normal height
Last checked
Still being checked 9
- The generator unit's place in the train (which car) isn't given by Hitachi
- Build years: assembly at Newton Aycliffe from July 2018, with early bodyshells from Kasado, Japan; deliveries planned until February 2020
- Driving-car length: 83 ft 10 in (25.56 m) nose to body end on LNER's livery drawings, 83 ft 2 in (25.35 m) in Hitachi's 2014 paper
- Heights: measured above the bottoms of the drawn wheels, which are drawn 3 ft 6 in (1.06 m) across; no source gives the real wheel size
- The cab front: laid on ADPL's sheet 1 outline (side B), within 6 mm; compared with 802304 at Welton (three-quarter) for its shape only
- The 801/1s' first day, 16 September 2019, is Rail's announcement of 1 August 2019, written before the launch; the nine-car 801/2s' start (November 2019) is from Wikipedia only
- Seats: Hitachi's 2014 design figures; LNER's current layout may differ (no LNER seat map was read)
- The car height: 12 ft 3 in (3.725 m) is the body's roof edge as LNER's livery drawings give it; no printed height has been found, and the grey roof covers stand about 0.27-0.3 m above it (801226, 801204)
- The years of the former liveries come from Wikipedia's class article and the other sources listed, and haven't been checked against a second source.
Know a source for one of these? Send it to us → (opens in a new tab)
How the drawing was made 5
- The pantographs: placed from photographs (scaled by the driving car's doors and windows, to about 0.3 m); no drawing of this class's roof has been published; drawn with no roof well, as photographs show the roof line level over it from the side, the folded pantograph standing about 240 mm above the roof edge, read off a close platform photograph of 811011 at Paddington scaled by its door: a lower bound, the camera being below the roof; a level, long-lens photograph would measure it
- The driving cars' cab-end bogie: placed at 14 ft 7 in (4,455 mm) from the nose from three side-on photographs (801226, 800017, 801107; they agree within about 50 mm), not from a dimensioned drawing; the wheelbase is drawn 2,600, Beacon's figure for the 803
- The bogies: the wheelbase is drawn 8 ft 6 in (2,600 mm), Beacon's figure for the 803 (the photographs read 2,574-2,670); the driving cars' inner bogie centre is drawn at 70 ft 4 in (21,450 mm) from the nose, against about 21,510 (±30) on two long-lens photographs of 802111 and about 21,590 on Beacon's diagram fitted to the doors: not settled, so left as drawn
- The underframes: from photographs only, no drawing of the AT300's underframe having been published; positions to about 150 mm on the level photographs and 1 ft 0 in to 2 ft 0 in (300-600 mm) on the three-quarter ones; intermediate cars without a side-on photograph of their own drawn with plain panels, or the 805's generator-unit group
- The inner gangway: from photographs of 802 and 800 joins, and the 807's seen three-quarter; no drawing of the gangway has been published. The bellows' top is drawn 11 ft 1 in (3,390 mm; the photographs read 3,358 and 3,425), their foot 1,220 (839111; 800020, closer, reads about 1,330); the cables' loops and the brackets are placed from the photographs to about 100 mm