‹ Underground Data updated
Waterloo & City line
Built to carry commuters from Waterloo to the City and known as “The Drain”, it runs non-stop between its two stations in four minutes, on weekdays only. Main-line railways ran it for nearly a century before it joined London Underground in 1994.
4 cars, about 218 ft (66 m)
The 1992 Stock, drawn whole to the same scale as every train on the site. More about it under Rolling stock ↓
Route 2 stations
Schematic, not to scale. Ringed stations are interchanges. Station order from TfL open data.
| Station | Zone | Interchanges |
|---|---|---|
| Waterloo | 1 | Bakerloo, Jubilee, Northern, National Rail |
| Bank | 1 | Central, Northern, DLR |
Stations, zones and interchanges from TfL open data (2026-10-07). National Rail interchanges are listed where TfL groups the stations together.
The map of where it runs is in the box at the top of the page. Drawn by GB Trains from station positions: a schematic, not an official map. Station positions: Powered by TfL Open Data. Track and the River Thames: © OpenStreetMap contributors (ODbL).
Rolling stock
- 1992 Stock since 1993
Coming to this line
- New Central and Waterloo & City trains 2030s (aspiration)
Along the line
How busy
10th of 10 Underground lines for journeys: 17.6 million in 2019. That is 11.8 million a mile, 8.8 million a station.
Busiest stations, 2025 (TfL’s station counts: entries and exits for the whole station, not this line)
- Waterloo: 74.5 million on 4 lines
- Bank and Monument: 41.1 million on 5 lines
Trains: 5 trains of 1992 Stock; 3.5 million journeys a train.
All the lines ranked, with the fleets and busiest stations →
History 14
- The Waterloo & City Railway opens to the public between Waterloo and City (now Bank), worked from the start by the London & South Western Railway.
- The London & South Western Railway absorbs the company.
- Becomes part of the Southern Railway.
- New English Electric trains, with the conductor rail moved to the outside; City station is renamed Bank.
- Last day before bomb damage closes the line; it reopens on 3 March 1941.
- Nationalised as part of British Railways' Southern Region.
- A travelator opens at Bank, the first in the UK.
- The trains are repainted in Network SouthEast colours.
- The 1992 Stock enters service after the line is converted to four-rail power.
- Transferred to London Underground for a nominal £1.
- Closes for five months for an upgrade, with the trains refurbished at Doncaster; it reopens on 11 September.
- Closed during the coronavirus pandemic.
- Reopens at peak times only, on weekdays.
- A full weekday service returns, every three minutes at peak; Saturday trains are not restored.
Sources and checking 12
How we source figures → · Spotted a mistake? Tell us → (opens in a new tab)
Show the 12 sources from Transport for London, London Transport Museum, Clive Feather and 3 more
- The Waterloo & City line London Transport Museum2 stations, no weekend service
- Waterloo & City line closes for five months from April 1 Transport for London (press release), 13 March 2006length (1.5 miles), 2006 closure and refurbishment, no Sunday service
- Brief History of the Waterloo & City Line (Corporate Archives Research Guide 29) Transport for London, 11 November 2024history, nickname, the Armstrong lift and depot access, transfer to London Underground
- Clive's UndergrounD Line Guides: Waterloo & City line Clive Feather, updated 23 April 2024dated history, depot, four-minute running time
- Waterloo & City Railway: opening for public traffic, 8 August 1898 (leaflet) London Transport Museum collectionpublic opening, 8 August 1898
- Waterloo & City line timetable from Waterloo (TfL Unified API) Transport for London (Powered by TfL Open Data)peak service of 19 trains an hour, weekday-only timetable
- Waterloo & City line to re-open ahead of schedule Transport for London (press release), June 2021reopening, June 2021
- Boost for the City as Waterloo & City line set to return to a full weekday service Transport for London (press release), October 2021full weekday service from November 2021, every three minutes at peak
- Mayor's Question 2022/0211: Tube usage (with TfL line boarder data) London Assembly, 18 February 202217.6 million line boarders in 2019 (TfL data)
- Call to restore Saturday services on the Waterloo and City line IanVisits, 26 March 2026calls to restore Saturday trains, 2026
- TfL Colour Standard, issue 11 Transport for London, August 2026line colour: RGB 118/208/189
- TfL Unified API: Line Route Sequence Transport for London (Powered by TfL Open Data)station order, zones and interchanges
Still being checked 1
Length: sources give 1.2 to 1.6 miles (2.0 to 2.5 km); the 1.5 miles (2.4 km) shown are TfL's “1.5 mile line”
Know a source for this? Send it to us → (opens in a new tab)