Rolling stock › In serviceData updated

Class 99 (Stadler)

Class 99 (Stadler): an electro-diesel (bi-mode) locomotive (Co-Co (UIC Co'Co')), built by Stadler Rail Valencia (for Beacon Rail), 2025 onward (30 ordered; first two arrived 10 June 2025). A freight locomotive: not drawn yet.

Drawing to come

Explore this train

Full specification

Type
Electro-diesel (bi-mode) locomotive
Builder
Stadler Rail Valencia (for Beacon Rail)
Built
2025 onward (30 ordered; first two arrived 10 June 2025)
In service
since 2026
Top speed
75 mph (121 km/h)
Traction
Bi-mode 25 kV AC overhead · all bi-mode trains →
Power
6,170 kW (8,270 hp); 25 kV AC (6,170 kW at wheel rim) plus Cummins QSK50 Stage V diesel (1,790 kW); AC/AC; HVO fuel; tractive effort 500 kN · how it works
Profile
main-line
Status
99001 first commercial train 28 July 2026; at least 99001-99013 delivered by Sept 2026 (99013 appears in a RAIL report). 99001-020 no train supply, 99021-030 with ETS (for Belmond). 13 more may be ordered for Caledonian Sleeper (not confirmed).

unverified Some of these figures are still being checked against an official source or a published history. Which ones ↓

Sources and checking 5

How we source figures →  ·  Spotted a mistake? Tell us → (opens in a new tab)

Still being checked 3

  • Length, height, width, bogie centres, bogie wheelbase, wheel diameter: NOT in the Stadler data sheet or anywhere read.
  • Weight 113 t from Wikipedia and GBRf's page (two sources).
  • Delivered count (13) is derived from the highest number seen in a RAIL report; Wikipedia said 7 delivered at May 2026.

Know a source for one of these? Send it to us → (opens in a new tab)

How the drawing was made 1
  • Not drawn: no drawing yet
Top