Rolling stock › WithdrawnData updated

Central London Railway locomotives

28 heavy locomotives for the 'Twopenny Tube'. Their unsprung weight shook buildings along the route, so they were replaced by multiple-unit trains after only three years.

Drawing to come

Full specification

Type
Electric locomotive
Builder
General Electric (USA), assembled at Wood Lane
Built
about 1900
In service
1900–1903
Lines
Central
Profile
tube

unverified Some of these figures are still being checked against an official source or a published history. Which ones ↓

Sources and checking 2

How we source figures →  ·  Spotted a mistake? Tell us → (opens in a new tab)

Still being checked 1

All figures (Wikipedia only; not yet checked against a published history)

Know a source for this? Send it to us → (opens in a new tab)

Top