Rolling stock › In serviceData updated

Class 195 Civity

CAF's Civity diesel train for Northern, with 24-metre aluminium cars, open gangways and doors at the thirds. Ordered with the electric Class 331 to replace the Pacers, it entered service in July 2019 and works across the North West, Yorkshire, Cumbria and Derbyshire, and to Lincoln and Nottingham.

Class 195 Civity, schematic side elevation, 3 cars
234 ft (71.4 m) (the cars’ lengths added)

Class 195 Civity · schematic drawing GB Trains · gbtrains.uk/stock/195/ · CC BY 4.0

Schematic side elevation of a full train, drawn from the dimensions below. Drawn from Arriva Rail North's dimensioned layout of the Class 195, measured at the scale of its printed lengths; the underframe equipment, the engine rafts among it, is laid out from photographs. Branding left out: Northern's name and lettered roundels, and the numbers. Drawn at 10 px per metre. Download SVG · Use this drawing

You’re welcome to use this drawing

Free to use, change and share, in print or online, under CC BY 4.0. Please credit it:

Drawing: GB Trains, gbtrains.uk, CC BY 4.0

Online, link the words to this page. The downloaded file already carries the credit; please leave it on. What the licence covers

Used it somewhere? Tell us where → (opens in a new tab)

Explore this train

Who runs it

Where it runs

Full specification

Type
Diesel multiple unit
Builder
CAF (Construcciones y Auxiliar de Ferrocarriles): bodies at Zaragoza and assembly at Irun, Spain
Family
Civity, with Class 196 Civity, Class 197 Civity, Class 331 Civity, Class 397 Civity (Nova 2)
Built
2017–2020
In service
since 2019
Operators
Northern
Formation
2 or 3 cars: 25 two-car units (DMSL-DMS) and 33 three-car (DMSL-MS-DMS)
Trains in fleet
58
Fleets
Northern: 58
Top speed
100 mph (161 km/h)
Traction
Diesel · all diesel trains →
Power
Diesel: an MTU power pack of 390 kW, with a ZF six-speed automatic gearbox, under every car · how it works
Bogies
CAF ARIN bogies (Civity UK) · drawn with the same bogie component as Class 196 Civity, Class 197 Civity, Class 331 Civity, Class 397 Civity (Nova 2)
Train length
234 ft (71.4 m) (the cars’ lengths added)
Coupled
2 × 3 cars, about 469 ft (143 m) (the units’ lengths added)
Car height
12 ft 8 in (3.85 m)
Car width
8 ft 11 in (2.712 m)
Profile
main-line
Walk-through
Yes
Air-conditioned
Yes
Seats per train
184
Total capacity
2-car: 108 seats and 15 tip-up; 3-car: 184 seats and 19 tip-up (Eversholt Rail). Northern's 2022 contract gives 124 and 204 seats, with 97 and 142 standing
Status
In service with Northern: 58 units (25 two-car and 33 three-car), maintained at Newton Heath with support from CAF.

Car types

CodeCarLengthDoors per side
DMSLDriving motor standard with lavatory (DMSL)78 ft 10 in24.026 m2 double
MSMotor standard (MS)76 ft 7 in23.35 m2 double
DMSDriving motor standard (DMS)78 ft 10 in24.026 m2 double

Sources and checking 24

How we source figures →  ·  Spotted a mistake? Tell us → (opens in a new tab)

Show the 24 sources from Wikimedia Commons, Arriva Rail North, Northern and 7 more

Last checked

Still being checked 5

  • Seats 184 the three-car unit as drawn, 19 tip-up besides, and 108 (+15) for the two-car row, both Eversholt's (already cited) moved from the capacity text; Northern's 2022 contract gives 204 and 124, which stay in the note; not re-read for this change
  • Built 2017–2020: Wikipedia; Rail Engineer found one two-car and six three-car units complete at Irun in January 2018, and Northern's 100th new train entered service in December 2020
  • Seats: Eversholt's 108 + 15 and 184 + 19 tip-up match Rail Engineer's 123 and 203 (2018); Northern's 2022 contract gives 124 and 204
  • Where they were built: Rail Engineer (2018) names Zaragoza for the bodies and Irun for assembly; Eversholt names Irun and CAF's Newport factory in Wales
  • Walk-through: Wikipedia is the only source read

Know a source for one of these? Send it to us → (opens in a new tab)

How the drawing was made 3
  • Door layout: Rail Engineer gives double-leaf plug doors at the one-third and two-thirds positions; their positions aren't printed as figures: they're measured off Arriva Rail North's layout drawing at the scale of its printed lengths, and a 2021 photograph (195102 at Burneside) agrees within about 100 mm
  • The Arriva Rail North years (2019-2020), when the drawn colours carried Arriva's wordmark: Wikipedia
  • Drawing: the underframe equipment, the grey lower nose and the livery are laid out from photographs, not measured; the DMS and MS underframes are assumed from the DMSL's
Top