Rolling stock › On order and planned

2024 Stock unverified

Siemens' Inspiro London design: the first deep-level tube train with air-conditioning, walk-through throughout. About 80% of the build is at a new factory in Goole, East Yorkshire.

Drawing to come

Type
Electric multiple unit
Builder
Siemens Mobility, Vienna and Goole
Built
2022 onwards
In service
first passenger service expected December 2026 – June 2027
Lines
Piccadilly
Formation
9 cars, articulated and walk-through
Trains in fleet
94 ordered
Train length
113.63 m
Car height
2.844 m
Profile
tube
Walk-through
Yes
Air-conditioned
Yes
Seats per train
256
Total capacity
About 10% more than the 1973 Stock (TfL)
Status
Not yet in passenger service. Four trains are testing in London, and entry into service has slipped twice from the original end-2025 target. The programme cost is £3.4bn. Peak service will rise from 24 to 27 trains per hour.

Car types

CodeCarLengthDoors per side
ADriving end car15.977 m2 double
BIntermediate car (long)13.938 m2 double
CIntermediate car (short)9.978 m1 double

Sources

unverified car lengths, height, seats and order of cars (Wikipedia only), doors per car (all doorways are double; the count per car isn't published)