Rolling stock › In serviceData updated

Class 398 Citylink

Stadler's Citylink tram-trains for the South Wales Metro, built in Valencia: three-section vehicles that take power from 25 kV overhead wires or batteries, with level boarding and no toilets. They are built to run on street tramways too, though none has yet been built in Cardiff.

Class 398 Citylink, schematic side elevation, 3 cars
Class 398 Citylink, schematic side elevation, 3 cars, in operation: pantographs raised to a contact wire at 5.0 mcontact wire 16 ft 5 in (5.0 m)
131 ft (40.07 m) over couplers

Class 398 Citylink · schematic drawing GB Trains · gbtrains.uk/stock/398/ · CC BY 4.0

Schematic side elevation of a full train, drawn from the dimensions below. Measured from Stadler's to-scale side view (data sheet, 2022), scaled to the printed 131 ft (40.07 m) over the couplers, which are covered in service; below the skirts only the wheels' bottoms and the track brakes show. Branding left out: the 'Metro' wordmark and chevrons, and the numbers. In operation: the pantograph raised to a contact wire 16 ft 5 in (5.0 m) above the rail, the Core Valley Lines' average height (Amey Infrastructure Wales, 2025; one wire, schematic). Drawn at 10 px per metre. Download SVG Download SVG · Use this drawing

You’re welcome to use this drawing

Free to use, change and share, in print or online, under CC BY 4.0. Please credit it:

Drawing: GB Trains, gbtrains.uk, CC BY 4.0

Online, link the words to this page. The downloaded file already carries the credit; please leave it on. What the licence covers

Used it somewhere? Tell us where → (opens in a new tab)

Explore this train

Who runs it

Where it runs

Full specification

Type
Tram-train (overhead electric and battery)
Builder
Stadler, Valencia (Spain)
In service
since 2026
Operators
Transport for Wales
Formation
Three sections, 131 ft (40.07 m), double-ended; up to three units together
Trains in fleet
36
Fleets
Transport for Wales: 36
Top speed
60 mph (97 km/h) in train mode; 45 mph (72 km/h) in tram mode
Traction
Electric 25 kV AC overhead, also traction batteries · all electric trains →
Power
25 kV AC overhead and traction batteries; four 150 kW motors · how it works
Bogies
Stadler Citylink tram-train bogies: a motor bogie under each cab section and two trailer bogies under the middle section, each with a magnetic track brake (Class 398)
Train length
131 ft (40.07 m)
Car height
12 ft 8 in (3.865 m)
Car width
8 ft 8 in (2.65 m)
Profile
light rail
Air-conditioned
Yes
Seats per train
126
Total capacity
126 seats including tip-ups and 252 passengers in all at 4 per m² (Stadler; TfW's 2023 notice). TfW's 2026 guide gives 104 seats and 28 tip-up. No toilets.
Status
First in passenger service on 23 June 2026, between Pontypridd and Cardiff Bay. Six had carried passengers by late September 2026, when Transport for Wales paused their use while Stadler updated software. All 36 are to run on the Treherbert, Aberdare and Merthyr lines and to Cardiff Bay, from Taff's Well depot.

Car types

CodeCarLengthDoors per side
DMS2Driving motor standard (DMS2), over a motor bogie1 double
PTSPantograph trailer standard (PTS)1 double
DMS1Driving motor standard (DMS1), over a motor bogie1 double

Sources and checking 15

How we source figures →  ·  Spotted a mistake? Tell us → (opens in a new tab)

Show the 15 sources from Wikimedia Commons, Stadler, Nation.Cymru and 7 more

Last checked

Still being checked 8

  • In service now: TfW said in late September 2026 that it was 'temporarily pausing their use'; Wikipedia, citing WalesOnline (not read), says they were withdrawn on 19 September 2026
  • First day: British Trams Online gives Tuesday 23 June 2026 (398 028); Nation.Cymru, published 24 June, says 'Monday'
  • Seats: 126 including tip-ups (Stadler; TfW, 2023) against 104 and 28 tip-up in TfW's 2026 guide
  • Length: 131 ft (40,070 mm; Stadler, 2022; TfW, 2023); Stadler's 2025 sheet rounds it to 131 ft (40,000 mm). The lengths of the three sections aren't given
  • Speed: TfW gives 60 mph (97 km/h; train mode) and 45 mph (72 km/h; tram mode); Stadler gives a maximum of 62 mph (100 km/h)
  • Deliveries: British Trams Online (June 2026) had 33 in South Wales, one at Old Dalby and two still to come; Nation.Cymru (September 2026) says TfW had taken delivery of all 36
  • Build years: not confirmed; the first unit reached Britain in May 2022 and Taff's Well in March 2023
  • Owners: SMBC Leasing and Equitix, from a consultant's case study (Apex Rail)

Know a source for one of these? Send it to us → (opens in a new tab)

How the drawing was made 2
  • Drawing: measured off Stadler's side view (to scale, without dimensions) at 9.915 mm per pixel, the printed 131 ft (40,070 mm) read as over the coupler faces: the bodies then measure 128 ft (38.94 m) nose to nose (12.60 + 0.84 + 12.05 + 0.84 + 12.60 m); the bogie centres, the 6 ft 5 in (1,950 mm) wheelbase and every height are read off it, good to about 20 mm
  • Folded pantograph: it measures 13 ft 0 in (3,957 mm) over the rail on Stadler's side view, about 90 mm over TfW's 12 ft 8 in (3.865 m) 'pantograph down', which matches the roof equipment's 12 ft 8 in (3,867 mm); drawn as the side view has it
Top