Rolling stock › In serviceData updated

Class 399 Citylink

Seven Citylink tram-trains built in Valencia by Vossloh (Stadler from 2016) for Britain's tram-train pilot: three-section vehicles, 122 ft (37.2 m) long, that run on Supertram's street tracks and on Network Rail's line through Rotherham. They are equipped for both 750 V DC and 25 kV AC, and carry the same blue, red and orange as the Supertram cars.

Class 399 Citylink, indicative only
Class 399 Citylink, indicative only, in operation: pantographs raised to a contact wire at 5.8 mcontact wire 19 ft 0 in (5.8 m)

Class 399 Citylink · indicative drawing GB Trains · gbtrains.uk/stock/399/ · CC BY 4.0

indicative drawing: some dimensions are estimated, from photographs and published figures. Stadler's to-scale data sheet for Sheffield is no longer published. It is laid out from photographs, every door, window, joint and bogie read off a view of 399 202 whole scaled to the 122 ft (37.2 m) length, the cab front and bogie covers from three more of 399 201 and 399 202 (2017-2025), and the heights estimated. Branding left out: the Supertram, Stagecoach and Travel South Yorkshire names, the numbers and the length and speed markings. In operation: the pantograph raised to a contact wire 19 ft 0 in (5.8 m) above the rail, the normal height of tramway wires over a carriageway (The Highway Code, rule 307; one wire, schematic). Drawn at 10 px per metre. Download SVG Download SVG · Use this drawing

You’re welcome to use this drawing

Free to use, change and share, in print or online, under CC BY 4.0. Please credit it:

Drawing: GB Trains, gbtrains.uk, CC BY 4.0

Online, link the words to this page. The downloaded file already carries the credit; please leave it on. What the licence covers

Used it somewhere? Tell us where → (opens in a new tab)

Explore this train

Full specification

Type
Tram-train (overhead electric, 750 V DC and 25 kV AC)
Builder
Vossloh España (Stadler Rail Valencia from 2016), Albuixech, Valencia (Spain)
Built
2015–2016
In service
since 2017
Lines
Sheffield Supertram
Formation
One articulated vehicle of three sections, 122 ft (37.2 m) long, on four bogies: a motor bogie under each cab section and a motor and a trailer bogie under the centre section, which has no doors
Trains in fleet
7
Top speed
60 mph (97 km/h) British Trams Online
Traction
Electric 25 kV AC overhead; 750 V DC overhead · all electric trains →
Power
750 V DC overhead (and equipped for 25 kV AC); six 145 kW motors · how it works
Bogies
Vossloh Citylink bogies, three powered and one trailer, under hinged covers (Class 399)
Train length
122 ft (37.20 m)
Car width
8 ft 8 in (2.65 m)
Profile
light rail
Air-conditioned
Yes
Seats per train
88
Total capacity
88 seated and 150 standing (Rail Engineer, 2013 and 2015); British Trams Online gives 96 seats and 140 standing
Status
In service: all seven, 399 201-207. Besides Supertram's own routes, 201-205 (with tram-train wheel profiles) run the Tram Train service from Cathedral over Network Rail track via Meadowhall South and Rotherham Central to Rotherham Parkgate, since 25 October 2018; 206 and 207 have tram wheel profiles and run on the tramway only (British Trams Online, 10 October 2026).

Sources and checking 16

How we source figures →  ·  Spotted a mistake? Tell us → (opens in a new tab)

Show the 16 sources from Wikimedia Commons, British Trams Online, Rail Engineer and 5 more

Last checked

Still being checked 5

  • Seats: 88 and 150 standing (Rail Engineer) or 96 and 140 standing (British Trams Online)
  • Top speed: 60 mph (97 km/h; British Trams Online); 62 mph (100 km/h; Wikipedia, citing Stadler)
  • Builder's name: ordered from Vossloh España in 2013; Stadler bought Vossloh's Valencia works before most were delivered (Rail Engineer, 2015: 'Vossloh, which is now owned by ... Stadler')
  • The 25 kV AC equipment: fitted for a future electrified main line, not used (Rail Engineer, 2013)
  • Height 12 ft 2 in (3.72 m), floor 1 ft 5 in (425 mm), 2 ft 4 in (720 mm) wheels: Wikipedia citing Stadler's sheet, not read

Know a source for one of these? Send it to us → (opens in a new tab)

How the drawing was made 2
  • The drawing: indicative, laid out from photographs (positions to about 0.1-0.3 m, re-based on the real nose with a 5.2% stretch of the end sections; heights estimated; the cab front's rake to about 2 degrees and its depth to about 0.1 m); Stadler's TTSYPTE0616e side view would settle it
  • Colours: sampled from photographs of 399 201 (2025) and 202 (2016); the orange sweep matched by eye to the Supertram cars'
Top