Rolling stock › On order and planned

New Bakerloo line trains unverified

Trains of the same design as the 2024 Stock, to replace the 1972 Stock. New trains and signalling would allow up to 24 trains an hour through central London.

Drawing to come

Type
Electric multiple unit
Builder
Siemens Mobility (option on the 2024 Stock contract)
In service
early 2030s (TfL); some reports say about 2035
Lines
Bakerloo
Trains in fleet
about 36 expected
Profile
tube
Status
Not yet ordered. TfL must exercise the Siemens option by 1 November 2026. Depot works at Stonebridge Park, Queen's Park and London Road are planned for July 2027 to December 2034.

Sources

unverified number of trains (reports range from 34 to 40), service date