New Bakerloo line trains
Trains of the same design as the 2024 Stock, to replace the 1972 Stock. New trains and signalling would allow up to 24 trains an hour through central London.
New Bakerloo line trains · schematic drawing GB Trains · gbtrains.uk/stock/bakerloo-new/ · CC BY 4.0
You’re welcome to use this drawing
Free to use, change and share, in print or online, under CC BY 4.0. Please credit it:
Drawing: GB Trains, gbtrains.uk, CC BY 4.0Online, link the words to this page. The downloaded file already carries the credit; please leave it on. What the licence covers
Compare with the 2024 Stock and the New Central and Waterloo & City trains →
Full specification
- Type
- Electric multiple unit
- Builder
- Siemens Mobility (option on the 2024 Stock contract)
- In service
- early 2030s (TfL); some reports say about 2035
- Lines
- Bakerloo
- Trains in fleet
- about 36 expected
- Profile
- tube
- Status
- Not known to be ordered. TfL had until 1 November 2026 to exercise the option for these trains on its Siemens contract; on 5 November 2026 the London Assembly asked the Mayor whether it had been, and no answer has been published. Depot works at Stonebridge Park, Queen's Park and London Road are planned for July 2027 to December 2034.
unverified Some of these figures are still being checked against an official source or a published history. Which ones ↓
Sources and checking 11
How we source figures → · Spotted a mistake? Tell us → (opens in a new tab)
Show the 11 sources from London Assembly, Transport for London, IanVisits and 5 more
- Mayor's Question Time: Bakerloo line London Assembly, March 2024option deadline
- Bakerloo line train upgrade moves forward as TfL seeks land for larger depots IanVisits, 1 July 2026fleet size, frequency, timescale
- TfL reopens market engagement for major Bakerloo line upgrade and new rolling stock programme Rail Technology Magazinedepot works programme
- Hopes TfL funding deal will lead to new Bakerloo line trains RAILfunding
- AECOM to deliver depot and sidings feasibility study for TfL's Bakerloo line upgrade AECOM, August 2026depot feasibility study
- Urgently replace Bakerloo line trains to prevent travel delays London Assembly (press release), 5 November 2026the Assembly's call of 5 November 2026 for the Mayor to say whether the option for new Bakerloo line trains has been exercised (status)
- Urgent Improvements Needed for the Bakerloo Line (motion, agreed unanimously) London Assembly, 5 November 2026the Assembly's motion of 5 November 2026 on the Bakerloo line and its trains (status)
- Deep Tube Upgrade Programme: Piccadilly line Upgrade Stage 1, rolling stock replacement (Programmes and Investment Committee, item 8) Transport for London, 16 May 2018the Bakerloo trains as an option on the same Siemens contract as the 2024 Stock (drawing)
- Piccadilly line Tube train (brochure) Siemens Mobility, August 2024the design meant as one standard fleet for the Bakerloo, Central and Waterloo & City lines (drawing)
- Siemens 9-car Piccadilly line trains (Underground News; John Hawkins) London Underground Railway Society, 4 December 2020the Bakerloo cars to be the same as the Piccadilly line trains (drawing)
- Bakerloo Line Upgrade - Compulsory Purchase Order (Board, 8 July 2026, item 8) Transport for London, 8 July 202636 new walk-through, air-conditioned trains, early 2030s
Still being checked 3
- Number of trains (reports range from 34 to 40)
- Service date
- Design, length and number of cars: drawn as the 2024 Stock until TfL publishes the trains' own
Know a source for one of these? Send it to us → (opens in a new tab)