‹ Underground Data updated
Piccadilly line
Opened in 1906 as the Great Northern, Piccadilly & Brompton Railway and extended in the 1930s with Charles Holden's stations, it serves Heathrow. Its 1973 Stock is being replaced by Siemens-built 2024 Stock.
6 cars, 352 ft (107.2 m)
The 1973 Stock, drawn whole to the same scale as every train on the site. More about it under Rolling stock ↓
Route 53 stations
Cockfosters – Acton Town 28 stations
Uxbridge – Acton Town 15 stations
Heathrow Terminal 5 – Acton Town 11 stations
Heathrow Terminals 2 & 3 – Hatton Cross via Heathrow Terminal 4 3 stations
Schematic, not to scale. Ringed stations are interchanges. Each strip is one branch, between junctions or termini. Station order from TfL open data.
| Station | Zone | Interchanges |
|---|---|---|
| Cockfosters | 5 | |
| Oakwood | 5 | |
| Southgate | 4 | |
| Arnos Grove | 4 | |
| Bounds Green | 3/4 | |
| Wood Green | 3 | |
| Turnpike Lane | 3 | |
| Manor House | 2/3 | |
| Finsbury Park | 2 | Victoria, National Rail |
| Arsenal | 2 | |
| Holloway Road | 2 | |
| Caledonian Road | 2 | |
| King's Cross St Pancras | 1 | Circle, Hammersmith & City, Metropolitan, Northern, Victoria, National Rail |
| Russell Square | 1 | |
| Holborn | 1 | Central |
| Covent Garden | 1 | |
| Leicester Square | 1 | Northern |
| Piccadilly Circus | 1 | Bakerloo |
| Green Park | 1 | Jubilee, Victoria |
| Hyde Park Corner | 1 | |
| Knightsbridge | 1 | |
| South Kensington | 1 | Circle, District |
| Gloucester Road | 1 | Circle, District |
| Earl's Court | 1/2 | District |
| Barons Court | 2 | District |
| Hammersmith | 2 | Circle (other station), District, Hammersmith & City (other station) |
| Turnham Green | 2/3 | District |
| Acton Town | 3 | District |
| Uxbridge | 6 | Metropolitan |
| Hillingdon | 6 | Metropolitan |
| Ickenham | 6 | Metropolitan |
| Ruislip | 6 | Metropolitan |
| Ruislip Manor | 6 | Metropolitan |
| Eastcote | 5 | Metropolitan |
| Rayners Lane | 5 | Metropolitan |
| South Harrow | 5 | |
| Sudbury Hill | 4 | |
| Sudbury Town | 4 | |
| Alperton | 4 | |
| Park Royal | 3 | |
| North Ealing | 3 | |
| Ealing Common | 3 | District |
| Heathrow Terminal 5 | 6 | Elizabeth line, National Rail |
| Heathrow Terminals 2 & 3 | 6 | Elizabeth line, National Rail |
| Hatton Cross | 5/6 | |
| Hounslow West | 5 | |
| Hounslow Central | 4 | |
| Hounslow East | 4 | |
| Osterley | 4 | |
| Boston Manor | 4 | |
| Northfields | 3 | |
| South Ealing | 3 | |
| Heathrow Terminal 4 | 6 | Elizabeth line |
Stations, zones and interchanges from TfL open data (2026-10-07). National Rail interchanges are listed where TfL groups the stations together.
The map of where it runs is in the box at the top of the page. Drawn by GB Trains from station positions: a schematic, not an official map. Station positions: Powered by TfL Open Data. Track and the River Thames: © OpenStreetMap contributors (ODbL).
Rolling stock
- 1973 Stock since 1975
Coming to this line
- 2024 Stock first passenger service expected December 2026 – June 2027
Earlier trains on this line
- Gate Stock (1906 Stock) 1906–1930
- 1920 Stock (Cammell Laird) 1920–1938
- Standard Stock 1923–1966
- 1935 Stock (streamlined prototypes) 1937–1976
- 1938 Stock 1938–1988
- 1956 Stock (prototypes) 1957–1995
- 1959 Stock 1959–2000
Along the line
Tunnels on this line
unverified These tunnels’ lengths and years, and which ones this line’s trains run through, are still being checked against a cited source: what’s in doubt.
How busy
6th of 10 Underground lines for journeys: 218.0 million in 2019. That is 4.9 million a mile, 4.1 million a station.
Busiest stations, 2025 (TfL’s station counts: entries and exits for the whole station, not this line)
- King's Cross St Pancras: 73.6 million on 6 lines
- Green Park: 29.6 million on 3 lines
- South Kensington: 27.8 million on 3 lines
Trains: 86 trains of 1973 Stock; 2.5 million journeys a train.
All the lines ranked, with the fleets and busiest stations →
History 15
- The Great Northern, Piccadilly & Brompton Railway opens from Finsbury Park to Hammersmith, opened by David Lloyd George.
- The branch from Holborn to Strand (later Aldwych) opens.
- Down Street and York Road close, followed by Brompton Road in 1934.
- Piccadilly trains start running west of Hammersmith, to South Harrow.
- Extended north from Finsbury Park to Arnos Grove, with stations by Charles Holden.
- Extended to Enfield West (now Oakwood) in the north and Hounslow West in the west.
- Extended to Cockfosters, and on 23 October to Uxbridge over the Metropolitan line.
- Extended to Hatton Cross; the 1973 Stock enters service the same year.
- Heathrow Central (now Terminals 2 & 3) opens, opened by the Queen.
- Heathrow Terminal 4 opens, on a one-way loop.
- Last trains on the Aldwych branch.
- Extended to Heathrow Terminal 5.
- TfL chooses Siemens to build new trains for the line; 94 are ordered that November.
- The first 2024 Stock train arrives in London for testing.
- Entry into service of the new trains is set for between December 2026 and June 2027.
Sources and checking 13
How we source figures → · Spotted a mistake? Tell us → (opens in a new tab)
Show the 13 sources from Transport for London, London Transport Museum, Clive Feather and 3 more
- The Piccadilly line London Transport Museumlength of 44.1 miles (71 km), 53 stations, Holden stations, Heathrow opening
- A Brief History of the Piccadilly Line (Corporate Archives Research Guide 41) Transport for London, 18 December 202453 stations, opening, extensions, closures, Heathrow
- Piccadilly line facts (archived) Transport for London, c. 2013length, depots, Holden stations
- Clive's UndergrounD Line Guides: Piccadilly line Clive Featherdated history, depots, shared track
- Aldwych (Holborn branch line) Subterranea BritannicaAldwych branch
- Piccadilly line upgrade Transport for London24 trains an hour now, 27 with the new trains; 86 trains to be replaced; service window
- Siemens Mobility Limited to be awarded TfL contract to design and manufacture a new generation of Tube trains Transport for London (press release), 15 June 2018Siemens chosen, June 2018
- First new Piccadilly line test train arrives in London Transport for London (press release), 16 October 2024first new train arrives, 14 October 2024
- Planned part closures on the Piccadilly line as vital upgrade work and testing of the brand-new trains gathers pace Transport for London (press release), 21 May 2026service window December 2026 to June 2027
- Piccadilly Line Upgrade Programme Stage 1 TfL Programmes and Investment Committee, 11 December 2025testing progress, resignalling not funded
- Mayor's Question 2022/0211: Tube usage (with TfL line boarder data) London Assembly, 18 February 2022218.0 million line boarders in 2019 (TfL data)
- TfL Colour Standard, issue 11 Transport for London, August 2026line colour: RGB 0/25/168
- TfL Unified API: Line Route Sequence Transport for London (Powered by TfL Open Data)station order, zones and interchanges