Rolling stock › In serviceData updated

Class 717 Desiro City

Siemens' six-car Desiro City for Great Northern's routes into Moorgate from Welwyn Garden City, Hertford North and Stevenage. The 25 trains carried their first passengers on preview runs from 28 September 2018 and entered regular service on 25 March 2019, replacing the 1970s Class 313s. Every car has two pairs of wide sliding doors on each side, and there's a door in the cab front so that passengers can get out in the Moorgate tunnels. In March 2023 the ORR authorised the fleet to carry passengers under ETCS Level 2 in-cab signalling on the Northern City Line, and on 8 July 2025 717020 ran the first passenger train on the upgraded ETCS software (Baseline 3), with the rest of the fleet to follow.

Class 717 Desiro City, schematic side elevation, 6 cars
Class 717 Desiro City, schematic side elevation, 6 cars, in operation: pantographs raised to a contact wire at 4.7 mcontact wire 15 ft 5 in (4.7 m)
399 ft (121.674 m) over couplers

Class 717 Desiro City · schematic drawing GB Trains · gbtrains.uk/stock/717/ · CC BY 4.0

Schematic side elevation of a full train, drawn from the dimensions below. Drawn on the Class 707's measured layout, which Siemens' own small side elevation of the 717 matches to within about 65 mm, with car 5's pantograph from that elevation; Great Northern's colours from photographs. The front emergency door (seen only from the front) isn't drawn. Branding left out: Great Northern's wordmark and the numbers. In operation: the pantograph raised to a contact wire 15 ft 5 in (4.7 m) above the rail, Network Rail's normal height (Network Rail, A Guide to Overhead Electrification, 2015; one wire, schematic). Drawn at 10 px per metre. Download SVG Download SVG · Use this drawing

You’re welcome to use this drawing

Free to use, change and share, in print or online, under CC BY 4.0. Please credit it:

Drawing: GB Trains, gbtrains.uk, CC BY 4.0

Online, link the words to this page. The downloaded file already carries the credit; please leave it on. What the licence covers

Used it somewhere? Tell us where → (opens in a new tab)

Liveries 1

Great NorthernGreat NorthernShown above

Special liveries 1

  • NHS thank-you wrap, 717011 April 2020 (COVID-19).

Explore this train

Who runs it

Where it runs

Full specification

Type
Electric multiple unit
Builder
Siemens Mobility, Krefeld (Germany)
Family
Desiro City, with Class 700 Desiro City, Class 707 Desiro City
Built
completed 2018
In service
since 2018
Operators
Great Northern
Formation
6 cars (399 ft (121.7 m))
Trains in fleet
25
Fleets
Great Northern: 25
Top speed
85 mph (136 km/h)
Traction
Electric 25 kV AC overhead; 750 V DC third rail · all electric trains →
Power
25 kV AC overhead and 750 V DC third rail; 1,200 kW at the wheels · how it works
Bogies
Siemens SF7000 bogies · drawn with the same bogie component as Class 700 Desiro City, Class 707 Desiro City
Train length
399 ft (121.674 m)
Car width
9 ft 2 in (2.80 m)
Train weight (tare)
about 204 t (Siemens)
Profile
main-line
Walk-through
Yes
Air-conditioned
Yes
Seats per train
362
Total capacity
943 passengers, all standard class (GTR). 362 seats: GTR counts 64 priority seats and 15 tip-ups among them; Siemens' data sheet gives 362 not counting tip-ups
Status
In service with Great Northern (GTR, in public ownership since 31 May 2026). Maintained by Siemens at Hornsey depot; financed by Rock Rail Moorgate.

unverified Some of these figures are still being checked against an official source or a published history. Which ones ↓

Car types

CodeCarLengthDoors per side
DMOSDriving motor (cars 1 and 6)67 ft 4 in20.52 m2 double
TOSTrailer (car 2)66 ft 2 in20.16 m2 double
TOSWTrailer with wheelchair spaces and space for a toilet (car 3, TOS(L)W)66 ft 2 in20.16 m2 double
MOSMotor (car 4)66 ft 2 in20.16 m2 double
PTOSPantograph trailer (car 5)66 ft 2 in20.16 m2 double

Sources and checking 33

How we source figures →  ·  Spotted a mistake? Tell us → (opens in a new tab)

Show the 33 sources from Wikimedia Commons, Siemens Mobility, GTR and 14 more

Last checked

Still being checked 4

  • Car lengths: no figure per car is printed for the 717; these are the Class 707's (Angel Trains: 67 ft 4 in (20.52 m) and 66 ft 2 in (20.16 m)), which add up to Siemens' 399 ft (121.674 m) unit length to within 6 mm
  • Car height: no figure has been published for the 717 (left blank)
  • Wheelbases (7 ft 3 in (2.2 m) motor, 6 ft 11 in (2.1 m) trailer) and wheels (2 ft 8 in (820 mm) new, 2 ft 6 in (760 mm) worn) are Siemens' Desiro City figures, not printed for the 717
  • Whether the 362 seats include the 15 tip-ups: GTR (2018) says they do, Siemens' data sheet says they don't

Know a source for one of these? Send it to us → (opens in a new tab)

How the drawing was made 3
  • The car codes DMOS, TOS, MOS and PTOS are Wikipedia's; Siemens names only the TOS(L)W, and its axle arrangement puts the motors in cars 1, 4 and 6. The pantograph on car 5 is read off Siemens' small drawing
  • The drawing: no dimensioned drawing of the 717 has been published. It uses the Class 707's measured layout and the Class 700's cab outline, which Siemens' small side elevation of the 717 matches to about 65 mm; the height (not published for the 717) is the 707's 12 ft 4 in (3.77 m); colours from photographs
  • The underframe: the PTOS read off one oblique photograph (positions to about 300 mm, heights to about 100 mm, the cases' set-in estimated) and checked for order only on a second; the TOS, TOSW and MOS are laid out from Siemens' 717 side view (layout only) because no photograph found shows them; the photograph shows the unit's other side (car 6 at the left), drawn mirrored on the turned PTOS
Top