Rolling stock › In serviceData updated

B23 Stock

CAF's Inneo trains for the DLR: five cars you can walk through, with 12 sets of doors a side, replacing the oldest trains.

B23 Stock, schematic side elevation, 5 cars
284 ft (86.7 m) over couplers

B23 Stock · schematic drawing GB Trains · gbtrains.uk/stock/b23/ · CC BY 4.0

Schematic side elevation of a full train, drawn from the dimensions below. Branding left out: the DLR roundel and the numbers. Drawn at 10 px per metre. Download SVG · Use this drawing

You’re welcome to use this drawing

Free to use, change and share, in print or online, under CC BY 4.0. Please credit it:

Drawing: GB Trains, gbtrains.uk, CC BY 4.0

Online, link the words to this page. The downloaded file already carries the credit; please leave it on. What the licence covers

Used it somewhere? Tell us where → (opens in a new tab)

Explore this train

Where it runs

Full specification

Type
Light rail vehicle, five cars walk-through
Builder
CAF, Beasain (Spain)
In service
since 2025
Lines
DLR
Formation
5 cars, walk-through (three motor cars and two trailers), 284 ft (86.7 m)
Trains in fleet
54 ordered
Top speed
50 mph (80 km/h)
Traction
Electric 750 V DC third rail · all electric trains →
Power
750 V DC third rail · how it works
Bogies
Inside-framed motor bogies, two motors each (B23); inside-framed trailer bogies under cars B and D
Train length
284 ft (86.70 m)
Car height
11 ft 6 in (3.512 m), to the top of the air-conditioning units; the roof line is 11 ft 4 in (3.461 m)
Car width
8 ft 8 in (2.65 m)
Profile
light rail
Walk-through
Yes
Air-conditioned
Yes
Total capacity
792 passengers (every seat and 5 standing per square metre), with 3 wheelchair spaces
Status
Being introduced: the first entered service in autumn 2025, the three in service were withdrawn in November 2025, and the first returned on 7 September 2026. TfL is finalising the rest of the rollout with CAF.

Car types

CodeCarLengthDoors per side
ADriving motor (cars A and E), with a cab54 ft 5 in16.58 m2 double
BTrailer (cars B and D)51 ft 1 in15.58 m3 double
CMotor (car C)51 ft 1 in15.58 m2 double

Sources and checking 25

How we source figures →  ·  Spotted a mistake? Tell us → (opens in a new tab)

Show the 25 sources from Transport for London, Wikimedia Commons, Rail Engineer and 5 more

Still being checked 1

Door width: the clear opening isn't printed on the general layout

Know a source for this? Send it to us → (opens in a new tab)

How the drawing was made 3
  • First passenger day: 30 September 2025 (British Trams Online; the photographer's caption on 209 at Stratford) or 29 September (Rail); TfL announced it on 1 October
  • The bogies: laid out from CAF's sheet; the long unit high in the middle and the motor bogies' box aren't identified, and the collector shoes the motor cars carry (Rail Engineer) aren't drawn, as the sheet doesn't mark them
  • The underframe: the cases' tones from two photographs (pale grey cases, dark grilles); the dark mass behind them to 1 ft 4 in (400 mm) is estimated (the sheet draws daylight between the cases, the photographs a dark shadow)
Top