Blackfriars
Opened in 1886 as St Paul’s, and rebuilt across the Thames for the Thameslink Programme in 2009–12: the only London station to span the river, under a roof of solar panels.
Where trains go
Blackfriars’s routes follow the railway out of London, then split to the parts of the country they reach, set at their compass bearings; point at a line to see who runs it. The other termini are the small dots; select one to open its page. Distances are true at the circle’s edge, 6 miles (10 km) out, and stretched towards the middle so the termini have room. The route colour is the map’s own: not official, and not any operator’s livery. All 13 together: the map on the Maps page.
Platforms 4
Seen from above, to scale: the platforms, tracks and the station building’s outline (the grey line) from OpenStreetMap, the buffer stops on the left (north is marked top left). The platforms run across the River Thames on the rebuilt bridge; the river’s banks (the blue-grey lines) from OpenStreetMap, smoothed to within 20 ft.
Trains
- Class 700 Desiro City Thameslink
- Class 465 Networker Southeastern
- Class 466 Networker Southeastern
The Class 700 is Thameslink’s whole fleet. Southeastern’s Networkers are listed by operator, as their records don’t yet name Blackfriars.
Around the station
Bridge nearby
History 4
- Opens as St Paul’s, for the London, Chatham and Dover Railway.
- Renamed Blackfriars by the Southern Railway.
- Rebuilt across the river for the Thameslink Programme; it reopens in February 2012 and is fully running by the summer.
- The solar roof is fitted, starting on 4 October 2011 and finishing in January 2014.
Sources and checking 9
Show the 9 sources from Govia Thameslink Railway, Railway Technology, New Steel Construction and 6 more
- London Blackfriars station celebrates 10 years since dramatic rebuild Govia Thameslink Railwayopening date and company, the street front, opened
- London Blackfriars Railway Technologytoday's building, architect, the rebuild, the renaming, the architects
- All change at London station New Steel Constructionplatforms
- London Blackfriars: station information Southeasternroutes
- Unified API, StopPoint HUBBFR Transport for Londonoperators, connections, Underground lines
- London Blackfriars: station information National Railwho manages it
- Table 1410: passenger entries and exits and interchanges by station, April 2025 to March 2026 (with each station's facility owner) Office of Rail and Road, 19 November 2026entries and exits, interchanges and rank, entries, exits, interchanges, rank
- Work begins to create world's largest solar bridge at Blackfriars Network Railthe train shed, the solar roof
- Platforms, tracks and station outlines of the London termini (Overpass API extracts) OpenStreetMap contributors, 10 October 2026the plan
Still being checked 5
- CO2 saving: 511 tonnes a year (Network Rail) vs 513 tonnes (GTR).
- Which numbers are bays and which through is inferred from live departure boards only.
- Original designers: railway-technology.com credits the 1886 bridge/station to John Wolfe-Barry and Henry Marc Brunel; one search snippet also credited 'Pascall and Watson' with the 1886 design, which is wrong (they are the 2012 concept architects).
- Exact opening and renaming dates are from Wikipedia only.
- Routes list is assembled from Southeastern's station page and live boards; no single source lists them.
Know a source for one of these? Send it to us → (opens in a new tab)