Three tunnels under the Strait of Dover between Folkestone and Coquelles, by Calais: two single-track railway tunnels and a smaller service tunnel between them. It is 31.4 miles (50.5 km) long, 23.5 miles (37.9 km) of it under the sea, and opened in 1994. Eurostar's trains, the Shuttles that carry cars, coaches and lorries, and freight trains run through it.
Route
London to the tunnel
Brussels, Lille
and Amsterdam20 miles
- Eurostar’s line
- the Channel Tunnel, portal to portal
- on to Paris, Brussels, Lille and Amsterdam
- other railways
The crossing
- under the sea
- under land
- open air, into the terminal
- Eurostar’s line (High Speed 1)
- other railways
- crossover cavern (not to scale)
- terminal or works
Along its length
Services 3
Eurostar
High-speed passenger trains from St Pancras to Paris, Brussels, Lille, Rotterdam and Amsterdam, over High Speed 1.
Trains: Class 374 (Eurostar e320), Class 373 (Eurostar e300)
LeShuttle
The Shuttles: trains that carry cars, coaches and lorries between the two terminals, hauled by Class 9 locomotives. They never leave the tunnel and its terminals.
Freight
Through freight trains, mostly hauled by Class 92 electric locomotives.
The tunnels
Cross section
Schematic, to scale from the published inside diameters. The rail level, the heights of the service tunnel and the relief duct, and the lining are indicative. The Shuttle’s and a Eurostar’s outlines are drawn in the next section.
How the trains fit
| Size | Spacing and notes | |
|---|---|---|
| Running tunnels | 24 ft 11 in (7.6 m) inside diameter | 98 ft (30 m) between their centres |
| Service tunnel | 15 ft 9 in (4.8 m) inside diameter | Its roadway about 3 ft 7 in (1.1 m) above the running tunnels' rails |
| Cross passages | 10 ft 10 in (3.3 m) wide | Every 1,230 ft (375 m) |
| Piston relief ducts | 6 ft 7 in (2 m) across | Every 820 ft (250 m): they arch over the service tunnel and join the two running tunnels |
| Contact wire | 19 ft 5 in (5,922 mm) above the rail |
| Width | Height | |
|---|---|---|
| Eurotunnel Class 9 | 9 ft 9 in (2,970 mm) | 13 ft 9 in (4,190 mm) |
| Passenger Shuttle carrier (double-deck), behind it | 13 ft 5 in (4,100 mm) | 18 ft 3 in (5,575 mm) |
| Eurostar e320 (Class 374) | 9 ft 7 in (2,924 mm) | 13 ft 9 in (4,191 mm) |
| Service tunnel vehicle (STTS) | 4 ft 11 in (1,500 mm) | 7 ft 3 in (2,200 mm) |
Schematic, end on and to one scale. A passenger Shuttle runs in one running tunnel, seen from ahead: its Class 9 locomotive, pantograph raised to the wire, with the double-deck carrier behind it shown faded. A Eurostar e320 runs in the other, and one of the service tunnel’s rubber-tyred vehicles (the STTS) on its roadway; the cross passage and the piston relief duct are as on the cross section above. Sizes are published for the carrier (a printed section), the service tunnel vehicle (its design specification) and the contact wire (the operator’s network statement gives 19 ft 5 in to 19 ft 9 in (5,922 to 6,030 mm) above the rail in the tunnel; the lower figure is drawn). The e320’s nose and windscreen are read from photographs, as no end elevation was found, and its width rests on a single source. The Class 9’s width and heights are the site’s own side drawing’s; its face is laid out on photographs, as no end elevation or level photograph from ahead was found, so its lamps, the width of its buffers, the height of its lamp band and its pantograph’s head are estimated. The service vehicle’s face and its roadway’s height are estimated, and the rail level and lining are indicative. Only the wire, the cross passage and the relief duct are labelled: no source this page holds places the cooling pipes, fire main, escape signs or walkways, so they are not drawn. Left off: Eurostar, Eurotunnel, Getlink and LeShuttle emblems, lettering and unit numbers.
The crossover caverns
Two caverns under the sea let trains cross from one running tunnel to the other, so half the tunnel can be closed for work while trains use the rest. The English one, about 4.3 miles (7 km) out from Shakespeare Cliff, was dug in stages (side headings, then the crown, the bench and the invert) and lined with sprayed concrete; it was the largest undersea cavern in the world when it was dug. The French one, about 7.5 miles (12 km) out from France in poorer ground, was built from a ring of small tunnels side by side, each at least 6 ft 7 in (2 m) high, before its core was dug out.
Schematic: the sections to one scale and the plan to another, each with its own bar. The sizes and distances are the Geological Society’s: the English cavern about 72 ft (22 m) wide, 49 ft (15 m) high and 541 ft (165 m) long, the French about 82 ft (25 m) wide, 62 ft (19 m) high and 591 ft (180 m) long. The English cavern’s outline is traced from the Society’s own section of it (its Figure 3), which measures about 69 ft 11 in × 48 ft 11 in (21.3 by 14.9 m) outside the lining; it is drawn at the text’s 72 ft × 49 ft (22 by 15 m). Wikipedia gives 492 ft × 59 ft × 33 ft (150 x 18 x 10 m) for the caverns and puts the English one 5 miles (8 km) out. The French cavern’s shape is not published: it is drawn as a smooth ring of small tunnels at its overall size, after Seattle’s Mount Baker Ridge tunnel, which Wikipedia says it was based on, so it is indicative, as are both caverns’ floors and tracks. The trains are the e320 and Class 9 of ‘How the trains fit’. Left off: lettering, logos and unit numbers on the trains.
Geology
The tunnel was driven along the Chalk Marl, a chalk with enough clay in it to be watertight and easy to cut. The Fosse Dangeard is a valley scoured about 279 ft (85 m) deep in the last cold stage and filled in since. The tunnel passes beside it, about half a kilometre from its edge, where its floor lies some 115 ft (35 m) below the tunnel; a branch of it crosses above the tunnel. The lowest point, about 9.9 miles (16 km) out from Shakespeare Cliff along the tunnel, is labelled with the Geological Society’s 377 ft (115 m); the section itself, traced, reads about 397 ft (121 m) there. The Society’s text puts the lowest point about 8.1 miles (13 km) offshore; its own section, traced here, has it about 9.9 miles (16 km) out. Traced from the Geological Society’s section of the tunnel, portal to portal; the layers are simplified and the heights approximate.
The rock
The tunnels were driven in one layer for nearly all their length: the West Melbury Marly Chalk, once called the Chalk Marl, near the foot of the Lower Chalk. It has no flints to wear the cutters, lets little water through and is less cracked than the chalk above. Below it lies the Glauconitic Marl, a thin green sandy bed that shows up clearly on seismic records and in borehole cores, so the surveyors could follow it from coast to coast; below that is the Gault Clay. At sea the ground was surveyed with multichannel seismic lines, a few costly deep boreholes drilled from jack-up rigs, and older boreholes tied in. On the French side the chalk is folded, faulted and cracked, so the boring machines there had to be able to work sealed against the water. Investigation and design began in 1985, three years before building.
The layers the tunnel passes through, top to bottom, not to scale, from the Geological Society’s description in our own words.
The English land works
The tunnel reaches England under Shakespeare Cliff, west of Dover, beside a platform built on the shore in 1843 for the railway to Dover. An exploratory adit was driven from it in 1974, and it became the main way in when the English tunnels were built; their spoil extended the platform west, and that land is now Samphire Hoe. From the cliff about 5.6 miles (9 km) of tunnel runs inland under the escarpment to the portal at Castle Hill, in the same Marly Chalk; at Holywell Combe it meets the Glauconitic Marl and the Gault Clay. Six large old landslides were found along the escarpment, and keeping the portal stable was the main problem on land. Holywell Combe, a Site of Special Scientific Interest, was dug by archaeologists and geologists in 1987, before building began; its deposits record about 13,000 years of the valley’s history.
Where the tunnel reaches England. It comes ashore under Shakespeare Cliff, west of Dover, beside a platform built on the shore in 1843 for the railway to Dover; the tunnel was built from there, and its spoil made Samphire Hoe. About 5.6 miles (9 km) of tunnel then runs inland under the hills to the portal at Castle Hill. Holywell Combe, dug by archaeologists and geologists in 1987 before building began, is placed approximately. Map data © OpenStreetMap contributors.
History 10
- A platform is built on the shore under Shakespeare Cliff, west of Dover, for the railway to Dover. The tunnel later comes ashore beside it.
- An exploratory adit is driven from the Shakespeare Cliff platform. It becomes the main way in when the English tunnels are built, and their spoil later makes Samphire Hoe.
- Archaeologists and geologists dig Holywell Combe, by the Castle Hill portal, before building begins; its deposits record about 13,000 years of the valley's history.
- Tunnelling starts.
- The service tunnel breaks through under the sea, joining England and France.
- The tunnel opens.
- Eurostar's passenger trains start running through it.
- A fire on a lorry Shuttle damages 151 ft (46 m) of tunnel; about six months to full working.
- High Speed 1 opens in full, and Eurostar moves to St Pancras.
- A second lorry Shuttle fire; full service again on 9 February 2009.
Statistics 20
Headline
| Figure | Value | Notes |
|---|---|---|
| Length, portal to portal | 31.4 miles (50.5 km) | Wikipedia gives 31.4 miles (50.46 km) in one place, 31.4 miles (50.5 km) in another; Getlink's own page says 31.3 miles (50.45 km). Rounding, not a conflict. |
| Under the sea | 23.5 miles (37.9 km) | The longest undersea tunnel section in the world. 5.8 miles (9.3 km) under England, 2.1 miles (3.3 km) under France. |
| Deepest point | 377 ft (115 m) below sea level | With at most 246 ft (75 m) of rock above the tunnel, about 9.9 miles (16 km) out from Shakespeare Cliff; the Geological Society's text says about 8.1 miles (13 km). Wikipedia's 246 ft (75 m) below sea level is that rock cover taken as a depth. The Society's own section, traced for the profile, reads about 397 ft (121 m). |
Engineering
| Figure | Value | Notes |
|---|---|---|
| Depth below the seabed | 148 ft (45 m) leaving England, 115 ft (35 m) leaving France | Where the two drives left the coasts (the Geological Society). Wikipedia gives 148 ft (45 m) as an average. |
| Bores | Two running tunnels, 24 ft 11 in (7.6 m); one service tunnel, 15 ft 9 in (4.8 m) | Inside diameters. The running tunnels are 98 ft (30 m) apart. |
| Cross passages | 270 (every 1,230 ft (375 m) by design) | One every 1,230 ft (375 m) by design, joining each running tunnel to the service tunnel: 135 places along 31.4 miles (50.5 km), two passages at each. Design diameter 10 ft 10 in (3.3 m). |
| Piston relief ducts | 194 (every 820 ft (250 m) by design) | 6 ft 7 in (2 m) across, joining the two running tunnels over the service tunnel to ease the air pushed ahead of a train. 31.4 miles (50.5 km) at 820 ft (250 m) would be 202; 194 were built. |
| Crossover caverns | 2: English about 4.3 miles (7 km) from Shakespeare Cliff; French about 7.5 miles (12 km) from Sangatte | Where trains can cross between the running tunnels. The Geological Society gives the English one about 541 ft (165 m) long, 72 ft (22 m) wide and 49 ft (15 m) high, and the French one about 591 ft (180 m) long, 82 ft (25 m) wide and 62 ft (19 m) high; its own section of the English one, to scale, measures about 69 ft 11 in × 48 ft 11 in (21.3 by 14.9 m) outside the lining. Wikipedia gives 492 ft × 59 ft × 33 ft (150 x 18 x 10 m) for the caverns and puts the English one 5 miles (8 km) out. |
| Power | 25 kV 50 Hz overhead, wire 19 ft 3 in (5.87 m) above the rail | Eurotunnel's own network statement gives the contact wire 19 ft 5 in to 19 ft 9 in (5,922 to 6,030 mm) above the rail in the tunnel; the cross section draws Wikipedia's 19 ft 3 in (5.87 m). |
Operations
| Figure | Value | Notes |
|---|---|---|
| Tunnel speed limit | 99 mph (160 km/h; designed for 200) | The Class 9 locomotives run at up to 99 mph (160 km/h); Eurostar's trains are held to the tunnel's limit too. |
| Shuttle crossing | 35 minutes platform to platform | About 35 minutes platform to platform; the time in the tunnel itself is shorter. |
| Terminals | Two, each with ten 2,625 ft (800 m) island platforms | Folkestone (about 140 ha) and Coquelles (more than 1,700 acres). Loops: Folkestone clockwise, Coquelles anticlockwise. |
Traffic
| Figure | Value | Notes |
|---|---|---|
| LeShuttle passenger vehicles, 2025 | 2,234,093 | Up 2% on 2024. 2017: 2.6 million cars, 51,000 coaches. |
| LeShuttle Freight trucks, 2025 | 1,163,124 | Down 3% on 2024 (1,198,052). 2017: 1.6 million HGVs. |
| High-speed passengers, 2025 | 11.8 million | Read from a chart label in search results, not yet from the results document. Eurostar carried 10.3 million in 2017; cross-tunnel passenger traffic peaked at 18.4 million in 1998. |
| Rail freight | 1.2 million tonnes in 2017 | An older figure. All freight through the tunnel, Shuttles included, was 19.6 million tonnes in 2007. |
History
| Figure | Value | Notes |
|---|---|---|
| Tunnel boring machines | 11 (6 English, 5 French) | Peak workforce 15,000; ten workers died 1987 to 1993. |
| Cost | £4.65 billion at 1985 prices (£2.6 billion estimated) | An 80% overrun. Wikipedia gives £9.8 billion in 2025 prices. |
| Construction | 1 December 1987 to 6 May 1994 | Investigation and design from 1985 (the Geological Society). Service tunnel breakthrough 1 December 1990 (pilot hole 30 October); passenger service from November 1994. |
| Fires | November 1996, 11 September 2008, 17 January 2015 | 1996: damage over 151 ft (46 m), about six months to full operation. 2008: repairs about 60 million euros, full service 9 February 2009. |
Every figure is cited in Sources.
Sources and checking
How we source figures → · Spotted a mistake? Tell us → (opens in a new tab)
Show the 26 sources from Wikipedia, Wikimedia Commons, Getlink and 14 more
- Channel Tunnel Wikipedia, read 27 October 2026lengths, bores, cross passages, ducts, caverns, construction, cost, fires, traffic
- Channel Tunnel (100 Great Geosites) The Geological Society, read 27 October, 2 and 11 November 2026the ground and its layers, depths below the seabed, the lowest point and the rock above it, the crossover caverns (its Figure 3 traced), the longitudinal profile (its Figure 1 traced), the land works and their history, investigation and design from 1985
- Eurotunnel Folkestone Terminal; Eurotunnel Calais Terminal; Samphire Hoe; Sangatte Wikipedia, read 27 October 2026the terminals, their platforms and loops; coordinates
- Network Statement: Fixed Link Usage Annual Statement, 2027 Working Timetable (DRR_NS_2027_EN_Final1) Eurotunnel (Getlink), 12 December 2025the power supply and contact-wire height (Eurotunnel's own network statement)
- Revenue 2025 (shuttle traffic in 2025) Getlink, 22 January 2026Shuttle traffic in 2025
- Annual results 2025 Getlink, 26 February 2026high-speed passengers in 2025
- Channel Tunnel, Running Tunnel North (ways 143253041 and 143253058) OpenStreetMap contributors (ODbL), read 27 October 2026the tunnel's line on the maps
- Land polygons Natural Earth (public domain), read 3 October 2026the coastline on the maps
- High Speed 1 Wikipedia, read 25 October 2026High Speed 1 on the London map
- Le Projet Tunnel sous la Manche (chapter 1 of Les Bâtisseurs du Tunnel, 7 pp.) Les Bâtisseurs du Tunnel (association)the passenger Shuttle carrier's section; the service tunnel vehicles
- Service Tunnel Transport System (Proceedings of the ICE: Civil Engineering, vol. 108, Channel Tunnel special issue 2, pp. 42-48) Thomas Telford, for the Institution of Civil Engineers (record: TRID 462436, Transportation Research Board), November 1995the service tunnel vehicle's size
- e320 Seating plan, coaches 1-16 [8243/23] (with a side view of the end car) Eurostar (copy hosted by Amsterdam Tips), undated (reference 8243/23); accessed 3 October 2026the Eurostar e320's roof height
- Eurostar e320 at St. Pancras International 2025-04-06.jpg (photograph, CC BY-SA 2.0) Wikimedia Commons (Bailey Amiss), 6 April 2025the e320's nose, windscreen and lamps, from photographs
- British Rail Class 374 (eurostar e320).jpg (photograph, CC BY-SA 4.0) Wikimedia Commons (ChilternSam)the e320's windscreen, checked on a photograph
- Eurostar e320 at Kensington Gardens 110.jpg (photograph, CC BY-SA 3.0) Wikimedia Commons (Panhard), October 2010the e320's lower nose, from a full-size mock-up
- Eurostar e320 at Kensington Gardens 111.jpg (photograph, CC BY 2.5) Wikimedia Commons (Panhard), October 2010the e320's lower nose, from a full-size mock-up
- Eurotunnel Class 9 Wikipedia, read 27 October 2026the Class 9's width and height (end-on drawing)
- 9711 side on, in motion (photograph supplied by the site's author, 30 October 2026) supplied by the site's author, supplied 30 October 2026the Class 9's heights in the end-on drawing, through the site's side drawing
- Eurotunnel Class 9705, leaving the Channel Tunnel at Coquelles Florian Fèvre, Wikimedia Commons (CC BY-SA 4.0), read 29 October 2026the Class 9's face, end on: its layout across, from a photograph
- Eurotunnel 9015, Nord-Pas-de-Calais Tony Hisgett, Wikimedia Commons (CC BY 2.0), read 29 October 2026the Class 9's face, end on: shapes, from a photograph
- ETL 9004+9003, Velim, August 1993 Petr Litomyský, Wikimedia Commons (CC BY-SA 4.0), read 29 October 2026the Class 9's face, end on: the heights of its bands, from a photograph
- The Channel Tunnel (proceedings of the 1989 conference of the Institution of Civil Engineers and the Société des Ingénieurs et Scientifiques de France) Thomas Telford, 1989cited by the Geological Society's page for the geology and the crossover caverns (not read)
- Engineering Geology of the Channel Tunnel Thomas Telford, 1996cited by the Geological Society's page for the geology (not read)
- Holywell Combe, Folkestone, UK: a 13,000 year history of an English chalkland valley Quaternary Science Reviews 18, pp. 1075-1125, 1999cited by the Geological Society's page for the 1987 Holywell Combe digs (not read)
- Steering clear of trouble (a 1987 newspaper graphic: the tunnel's route, and a geological section across the Channel) a newspaper; its source line Railway Gazette International, 1987; read 30 October 2026the layers column: the names of its outer two layers, and a check on their order
- LeShuttle Wikipedia, read 29 October 2026figures in the statistics
Last checked
Still being checked 9
- Most figures rest on Wikipedia and the Geological Society, not yet on Getlink's own documents
- The cross section's rail level, the service tunnel's and the relief duct's heights, and the lining are drawn indicatively; the diameters are sourced
- The maps: High Speed 1 is drawn as straight lines between its stations; the tunnel follows OpenStreetMap's line of the north running tunnel
- High-speed passengers in 2025 (11.8 million) were read from a chart label in search results
- The 'How the trains fit' drawings: the e320's face is read from photographs (no end elevation or cross section of it was found), the service tunnel vehicle's face and its roadway's height are estimated, and the carrier's section is read off one printed figure (good to about 15 mm)
- The Eurostar e320's width (9 ft 7 in (2,924 mm)) rests on a single source
- The Class 9 in 'How the trains fit': its face is laid out on photographs (no end elevation or level photograph from ahead was found), so its lamps, the width of its buffers, the height of its lamp band and its pantograph's head are estimated
- The geological profile is traced from a small published figure (460 px wide): layers simplified, heights approximate to about 16 ft 5 in (5 m) and positions along the tunnel to about 0.1 miles (0.2 km)
- The crossover caverns drawing: the English cavern is traced from the Geological Society's Figure 3 and drawn at its text's 72 ft × 49 ft (22 x 15 m); the French cavern's shape and ring, and both caverns' floors and tracks, are indicative
Know a source for one of these? Send it to us → (opens in a new tab)