Three tunnels under the Strait of Dover between Folkestone and Coquelles, by Calais: two single-track railway tunnels and a smaller service tunnel between them. It is 31.4 miles (50.5 km) long, 23.5 miles (37.9 km) of it under the sea, and opened in 1994. Eurostar's trains, the Shuttles that carry cars, coaches and lorries, and freight trains run through it.

The trains that run through it, side on and to one scale, in their operators’ colours. Not yet drawn in full: Class 374 (Eurostar e320) and Channel Tunnel Shuttle wagons. Services ↓

Route

London to the tunnel

Open on the map →Coquelles terminal (by Calais)Folkestone terminalSt Pancras InternationalAshford InternationalEbbsfleet InternationalStratford InternationalChannel TunnelEurostar to Paris,
Brussels, Lille
and Amsterdam
20 miles
  • Eurostar’s line
  • the Channel Tunnel, portal to portal
  • on to Paris, Brussels, Lille and Amsterdam
  • other railways
Eurostar’s line from St Pancras to Coquelles on the GB map’s track, the other railways in grey; the dashed arrow: on to Paris, Brussels, Lille and Amsterdam, as the GB map draws it. Drawn by GB Trains from station positions: a schematic, not an official map. Station positions: Powered by TfL Open Data. Track: © OpenStreetMap contributors (ODbL). Coastline: Natural Earth.Open on the Great Britain map →

The crossing

Folkestone terminal(Cheriton);UK portal at Castle HillShakespeare CliffSamphire Hoe: English cooling stationSangatteFrench shaft and cooling stationCoquelles terminalnext to CalaisEnglish crossover cavernabout 4.3 miles (7 km) outFrench crossover cavern7.5 miles (12 km) outEnglish ChannelENGLANDFRANCEEurostar to Paris,Brussels, Lilleand Amsterdam5 miles (8 km)
  • under the sea
  • under land
  • open air, into the terminal
  • Eurostar’s line (High Speed 1)
  • other railways
  • crossover cavern (not to scale)
  • terminal or works
The tunnel follows OpenStreetMap’s line of the north running tunnel; the south one is 98 ft (30 m) beside it. The crossover caverns are marked where the published distances put them, and their marks are far larger than the scale allows. England’s coast: contains OS data © Crown copyright and database right (OS Open Zoomstack); France’s: Natural Earth. Railways: © OpenStreetMap contributors (ODbL).Open on the Great Britain map →

Along its length

0 5 10 15 20 25 30 35 40 45 50 kilometres from the English portal English portal Castle Hill, Cheriton Shakespeare Cliff 5.8 miles (9.3 km) English crossover about 4.3 miles (7 km) out Lowest point about 9.9 miles (16 km) out French crossover 7.5 miles (12 km) off France French coast Sangatte shaft French portal 2.1 miles (3.3 km) under France under England under the sea: 23.5 miles (37.9 km) To scale along the bore (total 31.4 miles, 50.5 km). The profile below gives the depths: 148 ft (45 m) below the seabed leaving Kent, 115 ft (35 m) leaving France; the lowest point 377 ft (115 m) below sea level, with 246 ft (75 m) of rock above (the Geological Society).

Services 3

Eurostar

High-speed passenger trains from St Pancras to Paris, Brussels, Lille, Rotterdam and Amsterdam, over High Speed 1.

Trains: Class 374 (Eurostar e320), Class 373 (Eurostar e300)

LeShuttle

The Shuttles: trains that carry cars, coaches and lorries between the two terminals, hauled by Class 9 locomotives. They never leave the tunnel and its terminals.

Trains: Eurotunnel Class 9, Channel Tunnel Shuttle wagons

Freight

Through freight trains, mostly hauled by Class 92 electric locomotives.

The tunnels

Cross section

wire 19 ft 3 in (5.87 m) above the rail wire 19 ft 3 in (5.87 m) above the rail 98 ft (30 m) between the two running tunnels' centres (Wikipedia; see the note) 24 ft 11 in (7.6 m) inside diameter 24 ft 11 in (7.6 m) inside diameter RUNNING TUNNEL single track, one direction RUNNING TUNNEL single track, one direction SERVICE TUNNEL 15 ft 9 in (4.8 m) inside diameter kept at a higher air pressure than the running tunnels cross passage, 10 ft 10 in (3.3 m) every 1,230 ft (375 m; design spacing) piston relief duct: 6 ft 7 in (2 m) across, every 820 ft (250 m; design spacing) arches over the service tunnel and joins the two running tunnels Ground: West Melbury Marly Chalk (formerly Chalk Marl) flint-free, very low permeability; 148 ft (45 m) below the seabed leaving England, 115 ft (35 m) leaving France 16 ft 5 in (5 m) Schematic, to scale from the sourced diameters. Indicative: rail level, the height of the service tunnel and duct, and the lining (no thickness in the sources read). Cross passages are shown cut.

Schematic, to scale from the published inside diameters. The rail level, the heights of the service tunnel and the relief duct, and the lining are indicative. The Shuttle’s and a Eurostar’s outlines are drawn in the next section.

How the trains fit

contact wirecontact wirerunning tunnelrunning tunnelservice tunnelClass 9 and Shuttle carrierEurostar e320service tunnel vehiclecross passagecross passagepiston relief duct
The tunnels
SizeSpacing and notes
Running tunnels24 ft 11 in (7.6 m) inside diameter98 ft (30 m) between their centres
Service tunnel15 ft 9 in (4.8 m) inside diameterIts roadway about 3 ft 7 in (1.1 m) above the running tunnels' rails
Cross passages10 ft 10 in (3.3 m) wideEvery 1,230 ft (375 m)
Piston relief ducts6 ft 7 in (2 m) acrossEvery 820 ft (250 m): they arch over the service tunnel and join the two running tunnels
Contact wire19 ft 5 in (5,922 mm) above the rail
The trains in them
WidthHeight
Eurotunnel Class 99 ft 9 in (2,970 mm)13 ft 9 in (4,190 mm)
Passenger Shuttle carrier (double-deck), behind it13 ft 5 in (4,100 mm)18 ft 3 in (5,575 mm)
Eurostar e320 (Class 374)9 ft 7 in (2,924 mm)13 ft 9 in (4,191 mm)
Service tunnel vehicle (STTS)4 ft 11 in (1,500 mm)7 ft 3 in (2,200 mm)

Schematic, end on and to one scale. A passenger Shuttle runs in one running tunnel, seen from ahead: its Class 9 locomotive, pantograph raised to the wire, with the double-deck carrier behind it shown faded. A Eurostar e320 runs in the other, and one of the service tunnel’s rubber-tyred vehicles (the STTS) on its roadway; the cross passage and the piston relief duct are as on the cross section above. Sizes are published for the carrier (a printed section), the service tunnel vehicle (its design specification) and the contact wire (the operator’s network statement gives 19 ft 5 in to 19 ft 9 in (5,922 to 6,030 mm) above the rail in the tunnel; the lower figure is drawn). The e320’s nose and windscreen are read from photographs, as no end elevation was found, and its width rests on a single source. The Class 9’s width and heights are the site’s own side drawing’s; its face is laid out on photographs, as no end elevation or level photograph from ahead was found, so its lamps, the width of its buffers, the height of its lamp band and its pantograph’s head are estimated. The service vehicle’s face and its roadway’s height are estimated, and the rail level and lining are indicative. Only the wire, the cross passage and the relief duct are labelled: no source this page holds places the cooling pipes, fire main, escape signs or walkways, so they are not drawn. Left off: Eurostar, Eurotunnel, Getlink and LeShuttle emblems, lettering and unit numbers.

The crossover caverns

Two caverns under the sea let trains cross from one running tunnel to the other, so half the tunnel can be closed for work while trains use the rest. The English one, about 4.3 miles (7 km) out from Shakespeare Cliff, was dug in stages (side headings, then the crown, the bench and the invert) and lined with sprayed concrete; it was the largest undersea cavern in the world when it was dug. The French one, about 7.5 miles (12 km) out from France in poorer ground, was built from a ring of small tunnels side by side, each at least 6 ft 7 in (2 m) high, before its core was dug out.

The crossover caverns in section, all to one scale A crossover is a cavern where the two running tunnels meet, so trains can cross from one to the other. Every section stands on one rail level, with a train end on in each track, as on 'How the trains fit': a Eurostar e320 and a Shuttle's Class 9. 24 ft 11 in (7.6 m) 15 ft 9 in (4.8 m) Running tunnel Service tunnel inside diameters 33 ft (10 m): the scale of the sections Glauconitic Marl about 72 ft (22 m) wide about 49 ft (15 m) high sprayed-concrete lining English crossover about 7 km out; its crown 115 ft (35 m) below the seabed, its floor in the Glauconitic Marl; dug in stages and lined with sprayed concrete: the largest undersea cavern of its day about 82 ft (25 m) wide about 62 ft (19 m) high small tunnels side by side, filled to make its shell (indicative) French crossover about 12 km out, in poorer ground; built from a ring of small tunnels side by side, each at least 6 ft 7 in (2 m) high, before the core was dug out; its shape is not published Their lengths, in plan, at a smaller scale, beside a Eurostar e320 English crossover about 541 ft (165 m) long, 72 ft (22 m) wide French crossover about 591 ft (180 m) long, 82 ft (25 m) wide Eurostar e320 1,309 ft (399 m), 16 cars 328 ft (100 m): the scale of the plan Schematic. Sizes from the Geological Society's page; the English cavern traced from its Figure 3. Indicative: the French cavern's shape and ring, both caverns' floors and tracks.

Schematic: the sections to one scale and the plan to another, each with its own bar. The sizes and distances are the Geological Society’s: the English cavern about 72 ft (22 m) wide, 49 ft (15 m) high and 541 ft (165 m) long, the French about 82 ft (25 m) wide, 62 ft (19 m) high and 591 ft (180 m) long. The English cavern’s outline is traced from the Society’s own section of it (its Figure 3), which measures about 69 ft 11 in × 48 ft 11 in (21.3 by 14.9 m) outside the lining; it is drawn at the text’s 72 ft × 49 ft (22 by 15 m). Wikipedia gives 492 ft × 59 ft × 33 ft (150 x 18 x 10 m) for the caverns and puts the English one 5 miles (8 km) out. The French cavern’s shape is not published: it is drawn as a smooth ring of small tunnels at its overall size, after Seattle’s Mount Baker Ridge tunnel, which Wikipedia says it was based on, so it is indicative, as are both caverns’ floors and tracks. The trains are the e320 and Class 9 of ‘How the trains fit’. Left off: lettering, logos and unit numbers on the trains.

Geology

Fosse Dangeard tributary a branch of a buried valley, filled in Lowest point about 377 ft (115 m) below sea level 0 5 10 15 20 25 30 35 40 45 50 kilometres from the English portal 0 m -50 m -100 m -150 m England France sea chalk and older rock Chalk Marl, the layer the tunnel was driven in the tunnel To scale along the bore; heights exaggerated about 49 times. Traced from the Geological Society's section; approximate.

The tunnel was driven along the Chalk Marl, a chalk with enough clay in it to be watertight and easy to cut. The Fosse Dangeard is a valley scoured about 279 ft (85 m) deep in the last cold stage and filled in since. The tunnel passes beside it, about half a kilometre from its edge, where its floor lies some 115 ft (35 m) below the tunnel; a branch of it crosses above the tunnel. The lowest point, about 9.9 miles (16 km) out from Shakespeare Cliff along the tunnel, is labelled with the Geological Society’s 377 ft (115 m); the section itself, traced, reads about 397 ft (121 m) there. The Society’s text puts the lowest point about 8.1 miles (13 km) offshore; its own section, traced here, has it about 9.9 miles (16 km) out. Traced from the Geological Society’s section of the tunnel, portal to portal; the layers are simplified and the heights approximate.

The rock

The tunnels were driven in one layer for nearly all their length: the West Melbury Marly Chalk, once called the Chalk Marl, near the foot of the Lower Chalk. It has no flints to wear the cutters, lets little water through and is less cracked than the chalk above. Below it lies the Glauconitic Marl, a thin green sandy bed that shows up clearly on seismic records and in borehole cores, so the surveyors could follow it from coast to coast; below that is the Gault Clay. At sea the ground was surveyed with multichannel seismic lines, a few costly deep boreholes drilled from jack-up rigs, and older boreholes tied in. On the French side the chalk is folded, faulted and cracked, so the boring machines there had to be able to work sealed against the water. Investigation and design began in 1985, three years before building.

Youngest at the top. The layers dip gently, and the tunnels follow one of them. Upper and Middle Chalk with flints, and more cracked than the chalk below Lower Chalk, upper part more cracked than the Marly Chalk West Melbury Marly Chalk (once called the Chalk Marl) the tunnelling layer: no flints, lets little water through, fewer cracks Glauconitic Marl the foot of the Lower Chalk: a thin green sandy bed, the surveys' marker Gault Clay clay, below the chalk; the tunnels met it on land, at Holywell Combe Lower Greensand sands and sandstones, below the Gault Not to scale. The middle four layers as the Geological Society's page describes them, in our own words; the outer two named from a 1987 newspaper section. The order checked against the Society's Figure 1 and that section. The circles are the three tunnels.

The layers the tunnel passes through, top to bottom, not to scale, from the Geological Society’s description in our own words.

The English land works

The tunnel reaches England under Shakespeare Cliff, west of Dover, beside a platform built on the shore in 1843 for the railway to Dover. An exploratory adit was driven from it in 1974, and it became the main way in when the English tunnels were built; their spoil extended the platform west, and that land is now Samphire Hoe. From the cliff about 5.6 miles (9 km) of tunnel runs inland under the escarpment to the portal at Castle Hill, in the same Marly Chalk; at Holywell Combe it meets the Glauconitic Marl and the Gault Clay. Six large old landslides were found along the escarpment, and keeping the portal stable was the main problem on land. Holywell Combe, a Site of Special Scientific Interest, was dug by archaeologists and geologists in 1987, before building began; its deposits record about 13,000 years of the valley’s history.

Folkestone terminalat Cheriton Castle Hill portalunder Castle Hill, 413 ft (126 m) Holywell Combedug in 1987; placed approximately Shakespeare Cliff Haltthe 1843 platform; the builders' way in Samphire Hoemade from the tunnel's spoil Shakespeare Cliffthe tunnel goes out under the sea Folkestone Dover English Channel about 9 km of tunnel under land, Castle Hill to Shakespeare Cliff 2 miles (3.2 km) under the sea under land open air, into the terminal cliff country park terminal, portal or halt

Where the tunnel reaches England. It comes ashore under Shakespeare Cliff, west of Dover, beside a platform built on the shore in 1843 for the railway to Dover; the tunnel was built from there, and its spoil made Samphire Hoe. About 5.6 miles (9 km) of tunnel then runs inland under the hills to the portal at Castle Hill. Holywell Combe, dug by archaeologists and geologists in 1987 before building began, is placed approximately. Map data © OpenStreetMap contributors.

History 10

  1. A platform is built on the shore under Shakespeare Cliff, west of Dover, for the railway to Dover. The tunnel later comes ashore beside it.
  2. An exploratory adit is driven from the Shakespeare Cliff platform. It becomes the main way in when the English tunnels are built, and their spoil later makes Samphire Hoe.
  3. Archaeologists and geologists dig Holywell Combe, by the Castle Hill portal, before building begins; its deposits record about 13,000 years of the valley's history.
  4. Tunnelling starts.
  5. The service tunnel breaks through under the sea, joining England and France.
  6. The tunnel opens.
  7. Eurostar's passenger trains start running through it.
  8. A fire on a lorry Shuttle damages 151 ft (46 m) of tunnel; about six months to full working.
  9. High Speed 1 opens in full, and Eurostar moves to St Pancras.
  10. A second lorry Shuttle fire; full service again on 9 February 2009.

Statistics 20

Headline

FigureValueNotes
Length, portal to portal31.4 miles (50.5 km)Wikipedia gives 31.4 miles (50.46 km) in one place, 31.4 miles (50.5 km) in another; Getlink's own page says 31.3 miles (50.45 km). Rounding, not a conflict.
Under the sea23.5 miles (37.9 km)The longest undersea tunnel section in the world. 5.8 miles (9.3 km) under England, 2.1 miles (3.3 km) under France.
Deepest point377 ft (115 m) below sea levelWith at most 246 ft (75 m) of rock above the tunnel, about 9.9 miles (16 km) out from Shakespeare Cliff; the Geological Society's text says about 8.1 miles (13 km). Wikipedia's 246 ft (75 m) below sea level is that rock cover taken as a depth. The Society's own section, traced for the profile, reads about 397 ft (121 m).

Engineering

FigureValueNotes
Depth below the seabed148 ft (45 m) leaving England, 115 ft (35 m) leaving FranceWhere the two drives left the coasts (the Geological Society). Wikipedia gives 148 ft (45 m) as an average.
BoresTwo running tunnels, 24 ft 11 in (7.6 m); one service tunnel, 15 ft 9 in (4.8 m)Inside diameters. The running tunnels are 98 ft (30 m) apart.
Cross passages270 (every 1,230 ft (375 m) by design)One every 1,230 ft (375 m) by design, joining each running tunnel to the service tunnel: 135 places along 31.4 miles (50.5 km), two passages at each. Design diameter 10 ft 10 in (3.3 m).
Piston relief ducts194 (every 820 ft (250 m) by design)6 ft 7 in (2 m) across, joining the two running tunnels over the service tunnel to ease the air pushed ahead of a train. 31.4 miles (50.5 km) at 820 ft (250 m) would be 202; 194 were built.
Crossover caverns2: English about 4.3 miles (7 km) from Shakespeare Cliff; French about 7.5 miles (12 km) from SangatteWhere trains can cross between the running tunnels. The Geological Society gives the English one about 541 ft (165 m) long, 72 ft (22 m) wide and 49 ft (15 m) high, and the French one about 591 ft (180 m) long, 82 ft (25 m) wide and 62 ft (19 m) high; its own section of the English one, to scale, measures about 69 ft 11 in × 48 ft 11 in (21.3 by 14.9 m) outside the lining. Wikipedia gives 492 ft × 59 ft × 33 ft (150 x 18 x 10 m) for the caverns and puts the English one 5 miles (8 km) out.
Power25 kV 50 Hz overhead, wire 19 ft 3 in (5.87 m) above the railEurotunnel's own network statement gives the contact wire 19 ft 5 in to 19 ft 9 in (5,922 to 6,030 mm) above the rail in the tunnel; the cross section draws Wikipedia's 19 ft 3 in (5.87 m).

Operations

FigureValueNotes
Tunnel speed limit99 mph (160 km/h; designed for 200)The Class 9 locomotives run at up to 99 mph (160 km/h); Eurostar's trains are held to the tunnel's limit too.
Shuttle crossing35 minutes platform to platformAbout 35 minutes platform to platform; the time in the tunnel itself is shorter.
TerminalsTwo, each with ten 2,625 ft (800 m) island platformsFolkestone (about 140 ha) and Coquelles (more than 1,700 acres). Loops: Folkestone clockwise, Coquelles anticlockwise.

Traffic

FigureValueNotes
LeShuttle passenger vehicles, 20252,234,093Up 2% on 2024. 2017: 2.6 million cars, 51,000 coaches.
LeShuttle Freight trucks, 20251,163,124Down 3% on 2024 (1,198,052). 2017: 1.6 million HGVs.
High-speed passengers, 202511.8 millionRead from a chart label in search results, not yet from the results document. Eurostar carried 10.3 million in 2017; cross-tunnel passenger traffic peaked at 18.4 million in 1998.
Rail freight1.2 million tonnes in 2017An older figure. All freight through the tunnel, Shuttles included, was 19.6 million tonnes in 2007.

History

FigureValueNotes
Tunnel boring machines11 (6 English, 5 French)Peak workforce 15,000; ten workers died 1987 to 1993.
Cost£4.65 billion at 1985 prices (£2.6 billion estimated)An 80% overrun. Wikipedia gives £9.8 billion in 2025 prices.
Construction1 December 1987 to 6 May 1994Investigation and design from 1985 (the Geological Society). Service tunnel breakthrough 1 December 1990 (pilot hole 30 October); passenger service from November 1994.
FiresNovember 1996, 11 September 2008, 17 January 20151996: damage over 151 ft (46 m), about six months to full operation. 2008: repairs about 60 million euros, full service 9 February 2009.

Every figure is cited in Sources.

Sources and checking

How we source figures →  ·  Spotted a mistake? Tell us → (opens in a new tab)

Show the 26 sources from Wikipedia, Wikimedia Commons, Getlink and 14 more

Last checked

Still being checked 9

  • Most figures rest on Wikipedia and the Geological Society, not yet on Getlink's own documents
  • The cross section's rail level, the service tunnel's and the relief duct's heights, and the lining are drawn indicatively; the diameters are sourced
  • The maps: High Speed 1 is drawn as straight lines between its stations; the tunnel follows OpenStreetMap's line of the north running tunnel
  • High-speed passengers in 2025 (11.8 million) were read from a chart label in search results
  • The 'How the trains fit' drawings: the e320's face is read from photographs (no end elevation or cross section of it was found), the service tunnel vehicle's face and its roadway's height are estimated, and the carrier's section is read off one printed figure (good to about 15 mm)
  • The Eurostar e320's width (9 ft 7 in (2,924 mm)) rests on a single source
  • The Class 9 in 'How the trains fit': its face is laid out on photographs (no end elevation or level photograph from ahead was found), so its lamps, the width of its buffers, the height of its lamp band and its pantograph's head are estimated
  • The geological profile is traced from a small published figure (460 px wide): layers simplified, heights approximate to about 16 ft 5 in (5 m) and positions along the tunnel to about 0.1 miles (0.2 km)
  • The crossover caverns drawing: the English cavern is traced from the Geological Society's Figure 3 and drawn at its text's 72 ft × 49 ft (22 x 15 m); the French cavern's shape and ring, and both caverns' floors and tracks, are indicative

Know a source for one of these? Send it to us → (opens in a new tab)

Top