‹ Freight
Mendip Rail
MendipSize
Locomotives
| Class | Number | Note | As at |
|---|---|---|---|
| Class 59 | 0 | Search summaries (Wikipedia, Railway Magazine) say Freightliner took over the Mendip stone contract from DB Cargo and the 59s went to Heavy Haul Rail after the January 2026 split from Freightliner's intermodal arm; Mendip Rail's own Wikipedia page (edited 4 Nov 2026) still says it operates four 59/0s (Aggregate Industries) and four 59/1s (Hanson). Not resolved by any Mendip or operator page. | October 2026 |
Counts come from sources of different dates and are indicative. Every class, drawn.
Where it works
Traffic
- aggregates from Mendip quarries (Torr Works, Dulcote, Batts Combe, Whatley) to London and the South East
Depots
- Merehead TMD (Wikipedia: eight main-line locos allocated)
Ports, terminals and yards: Acton Yard.
Sources and checking
How we source figures → · Spotted a mistake? Tell us → (opens in a new tab)
- Mendip Rail Wikipedia (secondary; must be paired), 2026-10-25 (page edited 2026-10-08)company facts
- How Freightliner locomotive fleets are splitting after intermodal sale RAIL magazine, 2026-02-11the Class 59s in Heavy Haul Rail's pool after the intermodal sale (fleet)
- British Rail Class 59 Wikipedia (secondary; must be paired), 2026-10-2515 built; all 14 not with GBRf moved to Heavy Haul Rail in January 2026 (fleet; read 22 November 2026)
Still being checked 3
- Mendip Rail's Wikipedia page still lists four 59/0s and four 59/1s as its own; RAIL (February 2026) and Wikipedia's Class 59 page put all 14 not with GBRf at Heavy Haul Rail, and with 15 built they can't be both, so they're counted once, under Heavy Haul Rail.
- Livery not described in the source.
- Class 59 count (0, as at October 2026): not confirmed when re-checked in November 2026: Conflicting Wikipedia pages; no operator source..
Know a source for one of these? Send it to us → (opens in a new tab)