Main-line termini

Phase 2: the main lines out of five London termini. Line-by-line pages will follow the Underground pattern.

Euston unverified

London's first inter-city main-line terminus, built for the London & Birmingham Railway. Will become the London terminus of HS2.

Opened
1837
Platforms
18
Routes
West Coast Main Line, Watford DC line
Operators
Avanti West Coast, London Northwestern Railway, London Overground (Lioness), Caledonian Sleeper

St Pancras International unverified

The Midland Railway's terminus, with W. H. Barlow's single-span train shed. Rebuilt for Eurostar in 2007.

Opened
1868
Platforms
15
Routes
Midland Main Line, High Speed 1, Thameslink core
Operators
East Midlands Railway, Southeastern (high speed), Thameslink, Eurostar

King's Cross unverified

The Great Northern Railway's terminus, designed by Lewis Cubitt. The southern end of the East Coast Main Line to Edinburgh.

Opened
1852
Platforms
12
Routes
East Coast Main Line
Operators
LNER, Great Northern, Hull Trains, Grand Central, Lumo

Charing Cross unverified

The South Eastern Railway's West End terminus, reached across the Thames on Hungerford Bridge.

Opened
1864
Platforms
6
Routes
South Eastern Main Line (via London Bridge)
Operators
Southeastern

London Bridge unverified

London's oldest railway terminus still in use, first served by the London & Greenwich Railway. Rebuilt between 2013 and 2018.

Opened
1836
Platforms
15
Routes
Brighton Main Line, South Eastern Main Line, Thameslink
Operators
Southern, Southeastern, Thameslink